Career roadmap

Solar PV technician roadmap: from first safety to mid level

A solar PV technician installs, tests, commissions and maintains solar electric systems. This map runs from your country's licensing and safety rules to installation, testing, fault finding and storage. It suits electricians, roofers and career changers; allow months: about 380 study hours to the end of stage 8, plus supervised site work.

  • 12 stages
  • 53 topics
  • 346 things to tick off
  • about 606 hours if you do it all

Who it is for: Electricians and electrical apprentices, roofers and labourers moving into solar, school and college leavers, and career changers who want hands-on work in solar. · Entry to mid level · Updated 20 November 2026 · Suggest a change

Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps

Learn your country’s licensing and safety rules first, then build skills under supervision: roof and electrical work can kill, and who may connect a system to a building’s wiring differs by country.

What the work is and what employers asked for

The US Bureau of Labor Statistics says PV installers assemble, set up and maintain solar systems, mostly outdoors, and travel to job sites. What a solar PV technician actually does separates the roles.

In our sample of 17 installer, technician and O&M job postings (UK, US, India, Germany and Australia; how we research roadmaps), a small sample and not the market, the asks included:

  • a driving licence: 13
  • an electrical trade qualification or licence: 12 (all 4 UK, all 3 Indian, the Australian one, 3 of 4 German, 1 of 5 US)
  • roof or height work: 11
  • a battery or storage award or skill: 7
  • NABCEP (US credential): all 5 US postings, as preferred or something to obtain, never required

How people get in, by country

  • UK: the National Careers Service says you will usually need an electrical qualification; routes are college, T Level, apprenticeship, or labourer first.
  • Germany: an electrically instructed person may do DC-side work under a qualified electrician; most work on the installation behind the house-connection fuse is for firms in the network operator’s installer directory (NAV paragraph 13).
  • India: the national Solar PV Installer (Electrical) qualification is NSQF level 4: 390 hours, 120 on the job.
  • Australia: the Clean Energy Council says installation is always done by a licensed electrician.
  • US: a high school diploma and up to a year of on-the-job training are typical; some states require a licence.

A certificate or a safety card is not a licence.

How to use this map

Do not skip stage 3 (safety): begin it with electrical safety for DC and AC work and working at height on roofs.

Four topics are pick-one (regional code track, design tool, diagnostic instruments, certifications): take the one for your country or employer. Already an electrician? Skim stage 2, then spend your hours on stages 3, 4, 7 and 8.

A first 90 days of study (illustrative)

Stages 1 to 3 total 134 hours (13 + 67 + 54, the map’s estimates): about 10 hours a week for 13 weeks.

  • Weeks 1 to 2, stage 1 (13 hours): write a one-page route plan and start a skills log.
  • Weeks 2 to 8, stage 2 (67 hours): DC and AC circuit fundamentals first, then PV physics, the everyday sums, tools and fixings.
  • Weeks 8 to 13, stage 3 (54 hours): the safety topics, plus a paper isolation plan checked by a qualified person.

At day 90 you are not job-ready (about 380 hours to the end of stage 8, plus supervised work). You can explain the isolation routine and roof-work rules and apply for trainee posts, but that is not authorisation to do the work: on site you work under supervision. This week, open entry routes and who may do which work and write down the work you may do now.

Click any box to open it. Tick the circle on a topic to mark it done.

  • To do
  • In progress
  • Done
  • Skipped
  • Optional: learn any time
  • Pick one: one choice is enough, and it counts once

Stage 1 of 12 · 3 topics · about 13 h

The job, the routes and the rules

Name the job you are aiming for, the route that fits your country, the work you may legally do now, and the physical demands of the trade.

Stage 2 of 12 · 4 topics · about 67 h

Electrical and solar basics

Explain how a circuit and a PV string behave, do the everyday solar sums, and pick the right tool and fixing.

Stage 3 of 12 · 5 topics · about 54 h

Safety first (do not skip)

Explain safe isolation, lockout and permits, arc and fire risk, roof access and lifting, and read a written site plan. This is learning, not authorisation to do the work.

Stage 4 of 12 · 5 topics · about 48 h

Components and system types

Read a module datasheet, tell string, micro and hybrid inverters apart, and name the mounting, cables, protection and metering of the main system types.

Stage 5 of 12 · 4 topics · about 42 h

Codes, standards and grid connection

Find the standard, code and grid-connection rule that applies where you work, and know which permits, inspections and product listings a job needs.

Stage 6 of 12 · 4 topics · about 48 h

Survey, sizing and basic design

Survey a roof, size a system and estimate its yield, check string, inverter and cable design, and use one design tool.

Stage 7 of 12 · 5 topics · about 64 h

Installation practice

Describe how a job is planned, mounted and wired on the DC side, how the AC tie-in works (qualified electricians only), and how the work is recorded.

Stage 8 of 12 · 4 topics · about 46 h

Testing, commissioning and handover

Choose and check test instruments, explain the inspection and tests before switch-on, the commissioning steps and the handover paperwork.

Stage 9 of 12 · 5 topics · about 60 h

Fault finding, O&M and performance

Plan maintenance routines, read monitoring data, explain how DC and inverter faults are traced step by step, and pick the diagnostic instrument that fits the fault.

Stage 10 of 12 · 4 topics · about 46 h

Storage, EV charging and smart energy

Explain how home and commercial batteries work, how they must be sited and commissioned, and what EV chargers and smart controls add.

Stage 11 of 12 · 4 topics · about 50 h

Commercial and utility-scale

Describe commercial roofs, ground-mount plant construction and QA, why medium-voltage work needs separate authorisation, and acceptance testing at scale.

Stage 12 of 12 · 6 topics · about 68 h

Credentials, jobs and progression

Choose the certifications and licences for your region, turn a skills log into a CV, plan a move to crew lead or a specialism, and keep up with code changes.

That is the whole map

Work through it at your own pace: the progress you tick off is kept for you. When you are ready, see who is hiring for this role.

See live jobs
Live jobs

Live Solar PV technician jobs

Roles whose title matches this roadmap, from GreenHired's live listings.

All Renewable Energy jobs
FAQ

Questions about this roadmap

Do I need to be an electrician to work in solar?

For the connection to a building's wiring, usually yes; for roof and mounting work, not always. The UK National Careers Service says you will usually need an electrical qualification, the Clean Energy Council says installation in Australia is always done by a licensed electrician, and in Germany most work behind the house-connection fuse is for firms in the network operator's installer directory. In the US, the Bureau of Labor Statistics says some states require a licence for PV installers. Work only within your local licensing rules, and check them before you plan a route.

Can I get into solar with no experience?

Yes in some places, as a trainee or labourer working under supervision; live electrical work is not for beginners. About 5 of the 17 postings in our sample hired at trainee level with no solar experience (3 in the US, 2 in Germany), and the UK National Careers Service lists starting as an installation labourer and training on the job. Expect to need an electrical qualification before connection work in the UK, Germany and Australia, and the Indian adverts we read all asked for one.

How long does it take to become job-ready?

Plan in months, not weeks. Our estimate is roughly 380 hours of self-study up to the end of stage 8, and that excludes supervised work on real sites. For comparison, the Indian national installer qualification lists 390 hours including 120 on the job, the US Bureau of Labor Statistics says installers typically get on-the-job training lasting up to a year, and NABCEP's experience route counts six months of full-time-equivalent work.

What does a solar PV technician earn?

Published figures differ by country and none is a promise. The US Bureau of Labor Statistics gives a median of $53,140 a year for solar PV installers in May 2025, and the UK National Careers Service gives £25,000 for starters to £47,000 for experienced installers (England; both as read on 20 November 2026). Adverts in our sample, read on the same day and some already expired, listed $20 to $30 an hour for US entry roles and £45,000 to £55,000 a year for UK employed electricians. Read live adverts in your market for current ranges.

Is solar PV technician a good career?

It depends on your country and on whether you want outdoor, physical work at heights. The US Bureau of Labor Statistics projects employment of solar PV installers to grow 37 percent from 2025 to 2035, from about 31,100 jobs, which is a US projection. O*NET reports that 69 percent of surveyed installers work in high places every day (both as read on 20 November 2026). Compare live adverts and the physical demands before you commit.

Which certificate should I aim for?

It depends on the region, so read your target employer's adverts first. In the 17 postings in our sample, all 5 US ones named NABCEP as preferred or something to obtain, none as a requirement, and 3 of the 4 UK ones involved a solar award (one required a Level 3 award, one a BPEC qualification or equivalent, one offered to pay for City & Guilds 2922). Three of the 4 German postings asked for an electrical trade qualification, and the Australian one asked for a state electrical licence plus SAA (Solar Accreditation Australia) accreditation. The certification topic in stage 12 lists the routes by region, with prices and entry rules dated.

Is solar installation dangerous?

Yes. The US Bureau of Labor Statistics names falls from ladders and roofs, shocks from electricity and burns among the risks, and a PV string stays live in daylight even when the building supply is off. HSE says work at height must be properly planned, supervised and carried out by competent people, which is why stage 3 comes before any hands-on stage. Safe isolation, fall prevention and supervision matter more than speed.

Help us improve this roadmap

You know best what is missing, wrong or confusing. Suggest a change, report a problem or tell us anything else. The GreenHired team reads these notes.

Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.