System types, metering and monitoring
Grid-tied, hybrid and off-grid systems and solar pumps, and how output is measured, exported and watched. You will be able to say what each does in a power cut and how exports are counted.
- Core
- Beginner
- about 8 hours
Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps
What happens when the grid goes off? A customer should hear that answered first, because the answer sorts the four system types and sets the equipment, the paperwork and the safety rules. After that, follow the energy: how much stays in the building, how much is exported, who measures it, and how the exports are valued.
Net billing and net metering on the same bill
A small shop imports 2,000 kWh from the grid in a year and exports 2,340 kWh. Imports cost 20 units a kWh, and under net billing exports earn 8 units a kWh. These figures are invented, and the prices belong to no real tariff or scheme.
- Net billing: the bill is 2,000 x 20 - 2,340 x 8 = 40,000 - 18,720 = 21,280 units. The export credit is worth much less than the import it replaced.
- Net metering, one for one: the exports cancel the imports first, 2,000 - 2,340 = minus 340 kWh, so the shop ends the year with a surplus. What happens to that surplus (carried forward, paid or lost) depends on the scheme.
Same shop, same panels, a very different story. That is why “it cut my bill” needs the scheme named, and why a customer who hears one scheme’s savings under another scheme’s rules is misled. Check the programme’s own portal for the current rules before quoting any.
What to check at the meter and the login
Metering and monitoring are small jobs with checkable details. In the UK, MIS 3002 Issue 6.0 wants a means of recording total AC generation, a MID-approved meter where the reading is used for payment, with the serial number visible to photograph (clause 5.7.2), and a display the customer can read without a tool, ladder or torch (5.7.3). It also wants network credentials changed with the customer (5.7.6). A tidy install that hides the meter or leaves the default login has missed the point. Checking a meter against a payment scheme is covered in grid connection, metering and incentives, and reading the data afterwards in monitoring, SCADA and performance analysis.
Hybrid systems add a battery and a backup circuit: ask the customer which loads must stay on in a power cut, and match that to the equipment (the inverter side is covered in inverters, optimisers and microinverters).
What you will learn
- The main system types: grid-tied, hybrid, off-grid and solar pumping
- What happens to each type in a power cut
- The difference between self-consumption and export, and why export can be limited
- What a generation meter does and why a certified (MID) meter matters in the UK
- How monitoring and current clamps work, and why network security matters
- The difference between net metering and net billing, and which applies where you work
The parts of this topic
Grid-tied systemsabout 1 hour
A grid-tied system feeds the building and the network and shuts down when the network fails.
A grid-tied (utility-interactive) system connects to the building's wiring and the public network. Solar supplies loads first and any surplus is exported; a house, for instance, uses solar during the day and imports at night. When the grid is off the inverter disconnects so it cannot feed a line that crews may be working on, so never tell a customer that a grid-tied system keeps working in a power cut. The US Energy Information Administration explains how PV electricity feeds the grid.
- Photovoltaics and electricity US Energy Information Administration · Guide
- Electrical grid Energy Education (University of Calgary) · Guide
Hybrid systemsabout 1 hour
A hybrid system adds a battery to a grid connection and can provide backup if designed for it.
A hybrid system has a battery and a hybrid inverter or a battery inverter alongside the PV inverter. It stores surplus solar for evening use and, if designed for it, creates a local supply during an outage. The US Department of Energy notes that solar-plus-battery systems rely on advanced inverters to operate without the grid if designed to. Promise only the backup that the equipment and design can deliver, not whole-house power. Example: a backup circuit that keeps the fridge, lights and router on.
- Solar integration: inverters and grid services basics US Department of Energy · Guide
Off-grid systems and solar pumpsabout 1 hour
Off-grid systems stand alone with batteries; solar pumps drive water directly and often have no battery.
An off-grid system must meet the load by itself, with batteries sized for several days of poor sun and a generator in some cases; a solar pump runs a motor directly from the array and stores water instead of electricity (as when a farm pump fills a tank during the day). With no network behind it, every undersized part means a blackout, so do not size off-grid like grid-tied. India's PM-KUSUM scheme supports solar pumps for farms, and Lighting Global publishes quality assurance for off-grid solar products.
- PM-KUSUM: national portal (solar pumps and farm solar) MNRE (India) · Guide
- Lighting Global: quality assurance for off-grid solar products World Bank Group, Lighting Global · Guide
Self-consumption and exportabout 1 hour
Using solar in the building is worth more than exporting in many markets; export is paid or limited under local schemes.
Self-consumption is the share of solar energy used in the building, and export is the rest sent to the network. In Great Britain Ofgem's Smart Export Guarantee requires certain electricity suppliers (SEG licensees) to pay small-scale generators for exported electricity, and MIS 3002 requires an estimate of self-consumption to be given to the customer. A customer who is out all day may export most of their output, so an optimistic self-consumption figure misleads them. Network operators may also limit export where the local network is constrained (G100 in the UK).
- Smart Export Guarantee (SEG) Ofgem · Guide
Generation meters and MIDabout 1 hour
A generation meter records total AC output; where it is used for payment it must be a type-approved (MID) meter.
MIS 3002 says a means of recording and displaying total AC generation shall be installed, that where the reading is used for billing or payment the meter shall be MID-approved with its serial number visible, and that the display should be readable by the customer without a tool, ladder or torch. A meter the customer cannot reach or read defeats its purpose. MIS 3002 also says stored energy taken from the grid must not corrupt the generation meter reading. Example: a MID meter on the generation circuit with its serial number photographed.
- MIS 3002:2025 Issue 2.0 (redeveloped MCS scheme) MCS · Standard Clauses in section 3.7 of this issue (5.7 in Issue 6.0).
Current clamps, portals and network securityabout 1 hour
Monitoring measures with clamps or meters and reports to a portal; secure the device and respect the customer's network.
Monitoring uses current clamps or meters connected to the inverter or a gateway and reports to an online portal. MIS 3002 says network access credentials must be updated in consultation with the customer, that relevant components should comply with ETSI's consumer IoT security specification, and that for commercial premises permission shall be obtained from those responsible for IT security. In practice that means a unique password on the gateway and the portal login given to the customer. Do not join a network you have not been given permission to use.
- ETSI EN 303 645: cyber security for consumer internet of things ETSI · Standard Free to download. MIS 3002 cites it as ETSI TS 103 645 for connected solar equipment; the current document is EN 303 645.
Net metering and net billingabout 1 hour
Net metering offsets imports with exports; net billing values them separately. Schemes differ by country and change often.
Under net metering, energy exported is offset against energy imported, often one for one; under net billing, exports and imports are valued separately, often at different rates. The UPNEDA primer, a state agency's guide for vendors of 3 kW rooftop systems in Uttar Pradesh, says the net meter is installed only by the distribution company. Schemes change, so when a customer explains a lower bill, quote the programme portal's current rules, not an old rule.
- PM Surya Ghar: national portal for rooftop solar Ministry of New and Renewable Energy (India) · Guide
- Solar rooftop primer for vendors, 3 kW (UPNEDA) UPNEDA (Uttar Pradesh, India) · Guide A state agency primer; shows the Indian standards a vendor is expected to follow.
Practice task
Draw four block diagrams on one page, one for each system type (grid-tied, hybrid, off-grid, solar pump), showing modules, inverter or controller, battery or pump, meters and the connection to the grid or load. Under each, write what happens in a power cut and what is metered. Then write half a page on what you would tell a customer about export and about the credentials for their monitoring portal.
Skills you build
System architecturesSelf-consumption and exportGeneration meteringMonitoring awarenessNet metering and net billing
Resources for this topic
Every source here is free. Each link opens the provider's own site in a new tab.
- Solar photovoltaic system design basics US Department of Energy · Guide
- MIS 3002 Issue 6.0: the Solar PV Standard (Installation) MCS · Standard Free to read. Dated 18 March 2026; mandatory for contractors certified under it from 18 June 2026. The library also lists a redeveloped MIS 3002:2025 Issue 2.0, so check which one your employer is certified to.
- ESS design and installation manual (Victron Energy) Victron Energy · Guide A manufacturer manual: shows how hybrid systems are specified; follow the manual of the product you install.
- PVPMC: PV performance metrics Sandia National Laboratories · Guide
Live Solar PV technician jobs
Roles whose title matches this career path.
Spot a problem with this topic?
Tell us what is wrong, missing or unclear here. Your note is attached to this topic.
Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.