Electrical safety for DC and AC solar work
Why a live DC string differs from ordinary wiring, and the isolate, prove-dead and test routine that trained, authorised people follow. This page explains the ideas; it does not train or authorise you.
- Core
- Beginner
- about 14 hours
Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps
Solar adds a source you cannot switch off in daylight to a pattern every circuit follows: sources you must find, a way to stop each one, and a check that proves it stopped. This page explains the ideas; it is not isolation training and it does not authorise anyone to work. Your employer’s written procedure and hands-on training from a qualified person do that.
What ‘it’s all switched off’ leaves out
A customer says before a call-out that the solar is all off. The sentence hides four questions, and until each is answered the equipment is treated as live. This is an invented scenario to show how a trained person reads it, not advice for a real site.
Which switch was turned off, which circuits does it control, and was the result proved? That covers the grid supply, and it is only one source.
Is the DC side dead? An inverter that is off does not stop the modules making voltage. The Victorian regulators’ guideline warns that DC cables of PV systems can stay live with the power off, and OSHA says employers should make sure workers cover the panels, which is one precaution and not proof that anything is dead.
What about the battery, if there is one? Isolating the inverter does not de-energise a battery, which has its own isolator and shutdown procedure; lockout/tagout and permits to work covers the controls.
Can the meter be believed? A reading of zero means something only if the instrument was proved on a known source before and after the test. Test instruments and safe testing covers the instruments themselves.
The useful question is not ‘is it off?’ but ‘who isolated each source, how do we know, and who is authorised to confirm it?’ If the honest answer to the last part is ‘me’, and you are not trained and authorised, stop and ask. Who is authorised depends on your country and your licence, and entry routes and who may do which work goes through it.
When a trained person stops and asks
These are examples of stop points to write into your own plan; your employer’s procedure sets the real ones.
- A connector, cable or module is damaged. Mark it off and report it, because the Victorian guideline says damaged cables and equipment need a licensed electrical worker. Arc flash, DC arcs and fire risk covers what happens when a connection fails.
- The test equipment is not fit for the job, or cannot be proved. HSE’s GS38 covers test equipment for low-voltage work.
- Live work looks like the only way to finish. It is restricted to narrow, justified cases, and HSE’s GS38 page says to test dead wherever possible, since dead tests are often as effective as live measurements.
- Metalwork, an overhead line or a buried service is near the work and nobody has planned for it.
What you will learn
- Why PV modules and strings stay live in daylight even when the building supply is off
- The idea of safe isolation: isolate every source, lock off, prove the tester, test, prove again
- Why test instruments and leads must be fit for the job, and what GS38 is
- Why live working is restricted and is not for beginners
- How damaged modules, cables and connectors become shock and fire hazards
- What to do, and what not to do, if someone gets an electric shock
The parts of this topic
Modules are live in daylightabout 2 hours
PV modules make voltage whenever light falls on them, so the DC side is live even with the supply switched off.
A module produces a voltage in daylight, and strings in series add those voltages, so the DC side of an array can carry hundreds of volts. An inverter switched off at the AC side, for instance, still has live DC cables behind it. OSHA's lockout/tagout page says employers should make sure workers cover the solar panels as well as protecting them from the circuits; covering is one precaution, not proof that anything is dead. Do not assume that no sun means no voltage: even dull light can produce a dangerous voltage on a long string, and you cannot switch the sun off.
- Solar energy: lockout/tagout OSHA (United States) · Guide
- Solar energy: electrical hazards OSHA (United States) · Guide
Safe isolation: the routine, not the shortcutabout 2 hours
Isolate every source, lock off, prove the tester, test dead, prove again. Only trained, authorised people do this.
The routine is: identify every source of supply (grid, battery, generator, DC strings), isolate each, lock off and tag, prove your voltage indicator on a known source, test that the circuit is dead, then prove the indicator again. Skipping the prove steps because the job is small is the shortcut the routine exists to stop. HSE's guidance on safe working practices and on safety in electrical testing explains the principles. You may carry this out only if you are trained, competent and authorised and follow your employer's procedure.
- Safety in electrical testing at work (INDG354) HSE (Great Britain) · Guide
Proving dead, proving units and GS38 leadsabout 2 hours
Use a suitable voltage indicator and a proving unit, and test leads and probes that meet the guidance, not whatever is in the van.
A voltage indicator proves a circuit dead only if you know the indicator itself works, which is why you check it on a proving unit or known source before and after. A general-purpose meter with bare probes is the wrong choice: a meter can read zero when the meter, not the circuit, is at fault. In Great Britain HSE guidance note GS38 sets out what test equipment, leads, probes and clips should be like for work on low-voltage systems; shrouded probes with a small exposed tip and fused leads are one example.
- Electrical test equipment for use on low voltage electrical systems (GS38) HSE (Great Britain) · Guide Free to download.
Live working: why it is restrictedabout 2 hours
Working on live conductors is only allowed in narrow, justified cases with precautions; beginners never do it.
Great Britain's Electricity at Work Regulations 1989 and the US OSHA rules both restrict work on live parts. OSHA 1910.333 allows only qualified persons to work on circuit parts that have not been de-energised under its lockout and tagging procedures, and expects them to be able to work safely on energised circuits. For example, a qualified electrician makes a justified, risk-assessed live test with the right equipment and a second person present. A 'quick check' on something live is exactly the shortcut these rules exist to stop. Beginners never do live work.
- 29 CFR 1910.333: selection and use of electrical work practices OSHA (United States) · Law or regulation
- 29 CFR 1926.416: electrical safety requirements for construction OSHA (United States) · Law or regulation
Damaged modules, cables and connectorsabout 2 hours
Broken glass, cut insulation and damaged connectors can expose live parts; stop, make safe and report.
A cracked module can still produce voltage, and broken glass can expose conductors; damaged cables and connectors can expose live parts or overheat. Tape hides the damage, and the next person finds it the hard way, so a connector with a split housing found on a roof is marked off and reported rather than taped up. The Victorian guideline says any damaged electrical cables or equipment identified need to be repaired by a licensed electrical worker.
- MIS 3002 Issue 6.0: the Solar PV Standard (Installation) MCS · Standard Free to read. Dated 18 March 2026; mandatory for contractors certified under it from 18 June 2026. The library also lists a redeveloped MIS 3002:2025 Issue 2.0, so check which one your employer is certified to.
Shock from exposed metalworkabout 2 hours
Gutters, roof sheeting, frames and metal battens can become live in a fault, so earthing and bonding matter to you.
Metalwork is not safe just because it is 'not part of the circuit'. Exposed conductive parts such as guttering, roof sheeting, metal battens and array frames can become live if there is a fault in the installation, and the Victorian guideline names them as a shock risk for roof workers. A metal frame that is not bonded properly can carry a fault voltage to anyone touching it and the roof. Good earthing and bonding make a fault trip protection quickly.
- Electrical safety and you: a brief guide (INDG231) HSE (Great Britain) · Guide
- Grounding Energy Education (University of Calgary) · Guide
Overhead lines and buried servicesabout 2 hours
Keep well clear of overhead power lines and check for buried cables before digging or piling.
Overhead power lines carry very high voltage and can arc without being touched; a ladder or long rail swung up carelessly near an overhead service cable is one way it happens. OSHA's solar guidance tells workers to stay at least 10 feet away. Do not judge the distance by eye: plan the site, mark the lines and keep tools and materials clear before work starts. HSE has a guidance note on avoiding danger from overhead lines and another on underground services.
- Avoiding danger from overhead power lines (GS6) HSE (Great Britain) · Guide
- Avoiding danger from underground services (HSG47) HSE (Great Britain) · Guide
Electric shock: first aid awarenessabout 2 hours
Make the scene safe before touching the casualty, break the contact, call for help and give first aid; take a practical course.
Rushing in risks a second casualty. St John Ambulance's advice, written for low-voltage shocks, is to assess the situation, not to touch the casualty while they are in contact with the source, to turn off the source to break the contact, then to do a primary survey, treat injuries and call emergency services (999 or 112 in the UK). It does not cover high voltage, and a PV string cannot be switched off at the modules, so know where the isolators are and who will call for help before work starts. Tell your supervisor about any shock and have the person assessed medically.
- First aid at work HSE (Great Britain) · Guide
Practice task
Without touching any equipment, write a one-page isolation plan for a fictional rooftop system with a grid supply, a DC string array and a battery. List every energy source, who is authorised to isolate each, the order of steps (isolate, lock and tag, prove the tester, test, prove again), and the point at which you would stop and ask a supervisor. Have a qualified electrician or tutor check it, and note what they corrected.
Skills you build
Safe isolation conceptsProving deadLive-working limitsShock recognitionElectric-shock first aid awareness
Resources for this topic
Every source here is free. Each link opens the provider's own site in a new tab.
- Working safely when installing photovoltaic (PV) systems (Victoria, Australia, 2018) Energy Safe Victoria and WorkSafe Victoria · Guide A 2018 state guideline: rules differ by state, so use it for the hazards, not for your local law.
- Electrical safety (HSE electricity pages) HSE (Great Britain) · Guide
- The Electricity at Work Regulations 1989 (HSR25) HSE (Great Britain) · Law or regulation
- Electrical hazards (OSHA safety and health topic) OSHA (United States) · Guide
Latest Renewable Energy jobs
No title matches the role right now, so these are the latest jobs in the same category.
No live jobs to show right now. Check back soon, or browse every green job.
Spot a problem with this topic?
Tell us what is wrong, missing or unclear here. Your note is attached to this topic.
Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.