Stage 7: Installation practice · topic 27 of 53

Installing rails, hooks, flashings and modules

Fix it, seal it and torque it to the manufacturer's manual: setting out, hooks and flashings, rails, clamps, module handling and bonding, and when the job goes to an engineer or an electrician.

  • Core
  • Intermediate
  • about 20 hours

Part of the Solar PV technician roadmap: from first safety to mid level

Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps

The manufacturer’s installation manual is the work instruction, and the roof check is the design basis. Everything done on the roof either follows one of those two documents or is a reason to stop and call a supervisor. Knowing which departures are not yours to make, and recording what you did, is the habit to build.

A layout 100 mm short of the 400 mm edge default

A layout for a pitched tile roof puts the lowest row 300 mm from the eaves edge. The roof and the layout are made up. MIS 3002 issue 6.0 sets 400 mm from any edge of a domestic roof as the default, unless specific measures are taken, and 400 - 300 = 100 mm, so the drawing as it stands does not meet the default unless the designer has specified those measures.

Do not slide the array up 100 mm by eye: that moves where the hooks land, and the roof check assumed particular fixing points. Stop and report. The supervisor or designer decides whether to move the layout or specify the measures, and whether the structure needs re-checking. Then record it: photograph the revised setting out and note the revised drawing number in the job file.

What the job file must answer if the roof leaks

If a roof leaks months after the job, three questions follow: what was fitted, to which instructions, and how the roof was kept weathertight. So the job file names the module model and the kit’s parts, because a kit certified with named modules is certified only with those. It holds the torque marks, a dated photo of each flashing and fixing, and the manual page for every value applied. MIS 3002 says photographs and method statements can evidence weather-tightness, and that a roof warranty provider should be consulted where a warranty exists. See workmanship, QA and as-built records.

The parts that are not yours to decide

A ballasted flat roof needs a structural engineer to confirm the roof can take the array and the ballast, so that job does not start from an installer’s calculation; mounting systems and roof structures covers what each roof type must carry. Frame bonding is electrical work: the designer decides whether the frame needs earthing, and an authorised person makes the connection. Every minute on the roof also runs under the controls in working at height and roof safety.

Getting in as a trainee

Among the 17 postings in our sample (UK, US, Germany, India and Australia; how we research roadmaps), about 5 said they would take on a trainee with no solar experience and 11 asked for work at height or roof work.

Work only within your local licensing rules. The roof work itself is for trained people using planned access and fall protection.

What you will learn

  • Set out the array from the layout, find the fixing points and keep clear of roof edges and obstructions as the standard and the manual require
  • Fit hooks or brackets, flashings and rails so the roof stays weathertight and the loads reach the structure
  • Apply clamp positions and torque values from the manufacturer's instructions, and mark and record them
  • Handle modules safely, remembering that a module produces voltage whenever it is lit
  • Know how in-roof kits, flat-roof ballast and ground piles differ, and when the standard sends the job to an engineer
  • Know what frame bonding is for, and that connecting it is electrical work for an authorised person

The parts of this topic

Setting out and finding the fixing pointsabout 3 hours

Mark the array from the layout, find rafters or purlins, and keep the modules back from the roof edge unless extra measures are taken.

MIS 3002 issue 6.0 (clause 5.9.7) says modules should not be mounted within 400 mm of any edge of a domestic roof unless specific measures resist higher wind uplift, keep ridge tiles secure, protect rainwater run-off, control snow and reduce wind noise. Fixing points must reach the structure the roof check assumed: a hook placed between rafters carries almost nothing. If the real roof has an obstruction or a rafter elsewhere than the drawing shows, report the difference before fixing anything.

Hooks, brackets and flashingsabout 4 hours

Roof fixings must carry the load and keep the roof weathertight. Tiles or slates are notched or flashed so no larger gaps are left than before.

A hook that is strong but not sealed leaks months later, and the claim can land on the installer. MIS 3002 issue 6.0 says tiles or slates must be notched or flashed so gaps are no larger than before the installation, and that when fixing straight to metal roof cladding the sheet thickness and the fixing of the cladding to the structure must be checked. Pitched-roof products should be certified to MCS 012.

Rails, clamps and torqueabout 3 hours

Install components exactly as the manufacturer instructs: clamp positions, edge distances and torque values are part of the tested system. Mark and record them.

MIS 3002 issue 6.0 says all equipment should be installed to its manufacturer's instructions, and that mounting components must be specifically approved to work together unless the maker describes them as universally compatible; where a mounting system is certified with named modules, only those modules are to be used. Use a calibrated torque tool where the manual gives a value, then mark the fixing. A thread that fits is not proof two parts belong together, so do not mix one maker's rail with another's clamp.

Module handling and stagingabout 3 hours

Carry, lift and clamp modules without bending frames or cracking cells, and treat each module as live whenever it is lit.

HSE's manual handling approach is avoid, assess and reduce: use a lifting aid where you can, and plan two-person carries for large frames. Leaning a module on its corner can cause hidden damage that shows up later. Do not leave modules standing on edge on the roof where the wind can take them. Keep connectors capped and cables tidy so nobody touches bare contacts: the Victorian guideline notes that solar DC cables can stay live with the power off.

Frame bonding and earthing the arrayabout 2 hours

Bonding links the module frames and rails so a fault cannot leave them live. It is electrical work: do it only if authorised, and follow the design.

MIS 3002 issue 6.0 says the designer decides whether the array frame needs protective or functional earthing, and that a decision not to provide it must be justified in writing; normally the decision tree leads to earthing. A German training outline for instructed persons lists making the equipotential bonding for PV generator arrays among the practical tasks, done under an electrician's supervision. A roof with no metal is not a reason to skip bonding without recording why. Follow the design and the manufacturer's bonding hardware.

In-roof kits, flat roofs and ground mountsabout 5 hours

In-roof kits form the roof covering, flat roofs may be ballasted or fixed, and ground mounts need piles. Each has its own checks, and some need an engineer.

MIS 3002 issue 6.0 says an in-roof kit must have a fire rating suited to its location. For ballasted flat roofs it takes wind pressure coefficients from BRE Digest 489, uses a default friction coefficient of 0.3 unless tested and a compatible protection layer, and requires a structural engineer to confirm the roof can take array and ballast. Mechanically fixed flat roofs call for condition surveys and pull-out tests. The sources listed here have no verified guidance on ground piling: follow the engineer's design.

Practice task

Take a real manufacturer's mounting-system installation manual (many can be downloaded free) and write a one-page method statement for fixing an array on a pitched tile roof: the sequence of steps, fixings and torque values quoted from the manual with page numbers, edge distances from a layout, flashing checks, the photos you would take and the points where you would stop and call a supervisor. Do not go on a roof to do this task.

Skills you build

Setting out and fixingFlashing and weatherproofingTorque and clamp positionsModule handling

Resources for this topic

Every source here is free. Each link opens the provider's own site in a new tab.

Back to the whole roadmap

Live jobs

Live Solar PV technician jobs

Roles whose title matches this career path.

All Renewable Energy jobs

Spot a problem with this topic?

Tell us what is wrong, missing or unclear here. Your note is attached to this topic.

Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.