A test instrument can make a circuit safer to work on or give a false sense of safety. You will be able to match instruments and leads to a circuit, say how each is checked before use, and know who may use it.

  • Core
  • Intermediate
  • about 12 hours

Part of the Solar PV technician roadmap: from first safety to mid level

Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps

An instrument is chosen from the circuit, not from the tool bag. Find the highest voltage and current the circuit can reach, pick an instrument, leads and probes rated above that, check them, and only then ask who is authorised to use them there. Testing dead is the default: HSE’s GS38 says the regulations permit live work in few circumstances, testing and fault finding among them, and that dead tests are often as effective as live measurements.

Reading a rating against a string

A made-up string has 12 modules, each with a datasheet open-circuit voltage of 40 V: 12 × 40 = 480 V at standard test conditions. INDG354 gives, as a rough guide, 120 V ripple-free DC as the point above which voltages are hazardous even in a dry, unconfined location. Since 480 ÷ 120 = 4, this string is four times over that line. On a cold morning it can read higher than the datasheet figure; string, inverter and cable design explains why. Switching off the inverter does not make a lit string dead: the Victorian guideline warns that solar DC cables can stay live with the power off.

Ask GS38’s questions of any instrument you consider for it:

  • Are the meter and every lead, probe and clip rated for that voltage and for the installation category (CAT II, III or IV)? GS38 lists exceeding the category rating, such as CAT II equipment on a CAT III installation, among the causes of accidents.
  • Is any lead cracked, frayed or cut, or any probe tip long and bare? GS38 says damaged leads should be discarded.
  • Is the right function selected? GS38 says a multimeter set to a current or resistance range while measuring voltage has caused accidents.
  • If the aim is to show a circuit is dead, GS38 says to use a proprietary test lamp or two-pole voltage detector rather than a multimeter, and to prove the device before and after use.

Using an instrument on a real string is a separate step. INDG354 asks whether testers are competent and, if not fully competent, adequately supervised, and says not to rely on someone’s personal competence as the main protective measure.

Which instrument answers which question

  • Is current flowing in this cable? A clamp meter, within its ratings.
  • Why does string 2 give less than string 1? An I-V tracer with an irradiance sensor, compared at the same irradiance.
  • Is a connector or module running hot? A thermal camera, in enough sun, read by someone trained.
  • Are protective conductors continuous, and does the RCD trip? Continuity, loop and RCD testers on the AC side, by a qualified electrician.
  • Is the insulation sound? An insulation tester, set up and used only by an authorised person.

Diagnostic instrument families covers six instrument families in more depth, and inspection and tests before switch-on shows where the readings end up. Do not use any instrument on a real system unless you are authorised and supervised.

What you will learn

  • What each instrument measures: multimeter, clamp meter, insulation tester, continuity, earth-loop and RCD testers, I-V curve tracer, irradiance and temperature sensors, thermal camera.
  • Why testing is done dead wherever possible, and what HSE's GS38 says about leads, probes and test equipment.
  • How to check an instrument before use: leads, battery, calibration date, and a proving check on a known source.
  • What the voltage and measurement category ratings on an instrument and its leads mean for a DC string or an AC board.
  • Which instruments PV test forms expect, and why irradiance must be recorded when readings are compared.
  • Who may use which instrument on which part of the system in your region.

The parts of this topic

Multimeter and clamp meterabout 2 hours

A multimeter measures voltage, resistance and sometimes current; a clamp meter measures current without breaking the circuit. Use only ranges and ratings that suit the circuit.

GS38 says accidents have happened when a multimeter was used on a voltage above its maximum working voltage, or was set to the wrong function, such as a current range while measuring voltage. A digital AC/DC clamp meter reads current in a wire without breaking the circuit; a multimeter reads volts and ohms. A meter built for household circuits is the wrong tool on a high-voltage DC string, so check the meter's voltage and category rating, and its leads', against the circuit before use.

Insulation resistance testerabout 3 hours

An insulation tester applies a higher test voltage between circuits and earth to show whether the insulation is sound. On a PV array it needs a set-up that only an authorised person should perform.

The NABCEP guide describes testing array insulation resistance with a megohmmeter, recording the result in megohms and watching and listening for arcing or flashover; it advises insulating gloves and other PPE when touching an array. The set-up involves isolating circuits and short-circuiting the array, so it is for an authorised, trained person only. The test voltage depends on the system and the standard: use the current standard's value, not a remembered number or another code's guide. Results become a baseline for later tests.

Continuity, earth-loop and RCD testersabout 2 hours

These testers check that protective conductors are continuous, that a fault would clear quickly enough and that RCDs trip as designed. They are used on the AC side by qualified people.

The AC side of a PV installation is tested like any other electrical installation: continuity of protective conductors, earth-fault loop impedance and RCD operation. The IET's free model forms show where such results are recorded, as certificates for new work and for periodic inspection. Depending on the method, these tests need the supply isolated or live, and a qualified electrician does them. A loop-impedance figure on a certificate must be a number the tester displayed. Never enter a value you did not measure.

I-V tracer, irradiance and temperature sensorsabout 2 hours

An I-V tracer plots a string's current against voltage; irradiance and temperature sensors let you compare readings with expectation. Poor or changing light spoils the comparison.

IEC 61829 describes measuring an array's I-V characteristics on site, recording weather at the time and converting the result to standard test conditions. Solar Power World's article says an I-V tracer depends on a solar access window and that irradiance and temperature sensors normalise DC output for a simple performance check against inverter output. Example: two identical strings should give similar curves at the same irradiance. Curves taken under passing cloud cannot be compared.

Thermal cameraabout 1 hour

A thermal camera shows abnormal heat from poor connections or failing cells in arrays, junction boxes and electrical equipment. IEC TS 62446-3 covers outdoor inspection.

A hot spot photographed with no record of the irradiance, the camera settings or which module it was is of little use later. IEC TS 62446-3 (2017) covers outdoor infrared thermography of modules and plants in operation, to support preventive maintenance, fire protection, availability and quality checks. Solar Power World says technicians use thermal cameras to spot abnormal heat from poor connections in arrays and combiner boxes. A useful image needs enough sun and someone trained to read it.

Proving, calibration and who may testabout 2 hours

Check the instrument works before and after a dead test, keep calibration current, and test only what you are authorised and trained to test.

GS38 says any device used to prove dead may fail to indicate danger, so it should be proved before and after use, preferably on a voltage proving unit or a known live source of similar voltage. It also says test equipment must be maintained by a competent person, and that records of inspection and testing should be kept. Keep to the calibration interval too: a zero reading from an unproved tester proves nothing. The Victorian guideline says to isolate and lock out before work and to avoid contact with cables even when power is off, because PV cables can stay live.

Practice task

Make a one-page instrument card for each of five instruments (multimeter, clamp meter, insulation tester, I-V tracer, thermal camera) from free manufacturer datasheets: what it measures, its ranges and category rating, the leads it needs, the check you do before use, its calibration interval and one hazard. Then mark the instruments a trainee may only use under supervision. Do not use any instrument on a live system for this task.

Skills you build

Instrument selectionProving and checking instrumentsSafe test leads and probesReading instrument ratings

Resources for this topic

Every source here is free. Each link opens the provider's own site in a new tab.

Back to the whole roadmap

Live jobs

Live Solar PV technician jobs

Roles whose title matches this career path.

All Renewable Energy jobs

Spot a problem with this topic?