Workmanship, QA and as-built records
Quality records prove a solar job is right after the crew has left. You will be able to build a pack of dated photos, torque marks, a punch list, as-built drawings and honest test forms, and demonstrate the shutdown to the customer.
- Core
- Intermediate
- about 6 hours
Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps
Records written afterwards from memory are easy to get wrong and hard to defend, so build them as the job goes: a photo before something gets covered, a mark when a fixing is torqued, a drawing note whenever the job departs from the plan.
A two-string job, from the first photo to sign-off
A domestic roof with ten modules in two strings is the made-up job here. This is a walk-through, not a checklist for a real site.
- Before tiles go back over a flashing, photograph it with the date and job reference in the file name. Where a mounting kit is outside MCS 012, MIS 3002 expects evidence of how weather-tightness was kept, and its note lists photographic records.
- Each fixing is torqued to the manufacturer’s value (see installing rails, hooks, flashings and modules), marked, and the value noted. NABCEP’s final punch list includes verifying terminal torque and insulation integrity.
- On the day, string 2 is moved to the inverter’s other input because the first run was too long, once the designer has confirmed the input limits allow it. Mark the change on the as-built single-line drawing that day. A design drawing left in the file would send the next technician looking for string 2 on the wrong input.
- An authorised person tests and fills in the array test report from the instrument, naming it. You check that every box is filled and that none was copied from the design.
- Run the punch list. One item is open: a label is missing at the isolator.
The label is the decision point. Every item should end ticked or carry a named owner and a date, and an owner and a date is fine for a cosmetic item. A missing label, a loose connector or an open roof penetration should be closed before the crew leaves, so sign-off waits for it.
Who measures, who signs, who keeps the records
Measuring, signing and certifying electrical work belong to authorised people: see test instruments and safe testing and handover pack, certificates and registration. Keeping the records is a job for the whole crew, and a trainee can own the photo list and the punch list. Dated tasks with a supervisor’s name are also what a skills log needs. Report near misses and defects through your employer’s system too, so the next job is safer.
What you will learn
- Mark and record torque, and take dated photos of work that will be hidden once the job is finished.
- Run a punch list against the design and the manufacturer's instructions, and close every item or give it an owner and a date before leaving site.
- Mark up the as-built single-line and layout drawings wherever the job differed from the plan.
- Complete test and inspection forms honestly, with the instrument used and the date.
- Leave the site tidy and the roof weathertight, and demonstrate the system and its shutdown to the customer.
- Report near misses and defects through your employer's system so the next job is safer.
The parts of this topic
Torque marks and the photo recordabout 1 hour
Mark each torqued fixing and photograph work that will be covered. A dated photo set is the cheapest evidence you will ever have.
A photo of only the finished roof proves little about the hidden work, so photograph flashings before tiles go back, each rail fixing, cable routes, label positions and the finished array, with the date and job reference in the file name. Where a mounting system is outside MCS 012, MIS 3002 says the contractor must be able to evidence how roof weather-tightness was maintained, and its note says this may include photographic records and installation method statements. Installers must also evidence component compatibility. Torque to the manufacturer's value and mark each fixing so a later visit can see movement.
- MIS 3002:2025 Issue 2.0, section 3.5 MCS · Standard Free for personal use. Evidence expected where mounting is outside MCS 012.
The punch list and as-built drawingsabout 2 hours
A punch list is the last check of every item against the design and the manual. As-built drawings show what was really installed, not what was planned.
The NABCEP guide describes a final checkout punch list covering disconnects open, a visual inspection of structure and connections, torque and insulation integrity, consistency with the design and code, and unresolved items. Where the job differed from the plan, mark the change on the single-line and layout drawings: a string moved to another input, for instance, must appear on the drawing. A free 2D CAD tool such as LibreCAD can hold the mark-ups. A design drawing left in the file as if it were as-built misleads the next person.
Test and inspection formsabout 1 hour
Test forms record what was measured, with which instrument and on what date. They are evidence, so fill them in as you go, never from memory.
MIS 3002 reproduces model forms adapted from BS EN 62446-1: a verification certificate and an array test report that records each string's open-circuit voltage, short-circuit current, irradiance, polarity check, insulation resistance and the instrument used. The standard the forms come from is paid. Only an authorised person measures and signs; your task is to understand the form and keep it complete. Example: a string's Voc copied from the design instead of read from the instrument.
A tidy site and a weathertight roofabout 1 hour
Leave the roof weathertight and the site clear every day, not just at the end. Loose waste, open penetrations and stored kit cause damage and injuries.
HSE's roof work guidance says roof work must be planned for safety, which includes what is left at the end of each day. Remove offcuts, close or cover any penetration, secure remaining modules and rails against wind, and clear the access route. Dispose of packaging and metal waste as your employer's waste plan requires. Clear up as you go: saving it all for the last hour of the last day means it gets rushed.
- Roof work: HSE guidance for construction HSE (UK) · Guide Planning, access, edges and fragile surfaces.
Customer demonstration and shutdownabout 1 hour
Show the customer the meter, the inverter display, how to isolate the system safely and who to call, and leave the documents with them.
A folder left on the table is not a demonstration. MIS 3002 says the document pack must be provided and explained at handover, and must include the checks customers should do themselves and what to do if there is a problem. The California C-46 exam outline lists educating the client as part of commissioning. Walk the customer to the generation meter, show how to read it, show the shutdown procedure and labels, and write down the helpline.
- California Solar (C-46) licence exam study guide California Contractors State License Board · Guide Lists educating the client within PV installation and commissioning.
- Renewable Energy Consumer Code RECC · Guide UK consumer code covering quotations, contracts, guarantees and after-sales service.
Practice task
Make a one-page quality pack template for a domestic installation: a punch list of at least 20 checks drawn from the MIS 3002 clauses and a manufacturer's manual, a photo list (what, from where, when), an as-built mark-up box and a sign-off block. Test it by filling it in for a sample job you describe in one paragraph.
Skills you build
Punch listsPhoto recordsAs-built drawingsCustomer demonstration
Resources for this topic
Every source here is free. Each link opens the provider's own site in a new tab.
- MIS 3002 Issue 6.0, clause 5.6.1, section 6 and Appendices E and F MCS · Standard Free for personal use. Workmanlike standard, commissioning, handover document and maintenance checklist.
- NABCEP PV Installation Professional Resource Guide, chapter 6 NABCEP · Guide Completing system installation: punch list, visual inspection, documentation. 2016 edition.
- BS 7671 model forms (free blank PDFs) IET · Template UK. Free for your electrical contracting business under the IET's terms; check them before reuse. Study the layout of the forms here.
- Risk assessment: HSE overview HSE (UK) · Guide Identify hazards, judge likelihood and seriousness, then control the risk.
Latest Renewable Energy jobs
No title matches the role right now, so these are the latest jobs in the same category.
No live jobs to show right now. Check back soon, or browse every green job.
Spot a problem with this topic?
Tell us what is wrong, missing or unclear here. Your note is attached to this topic.
Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.