Stage 3: Safety first (do not skip) · topic 12 of 53

Manual handling, RAMS and site safety

Lifting modules safely and writing the plan before the work: manual handling, risk assessments, method statements, induction, PPE and site cards. You will build a RAMS pack for a module delivery.

  • Core
  • Beginner
  • about 10 hours

Part of the Solar PV technician roadmap: from first safety to mid level

Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps

Every RAMS pack answers three questions: what could go wrong on this site, what will we do about it, and in what order will we work? Rank the hazards of the real roof and the real delivery, and write steps a crew could follow without you in the room.

Getting 20 modules from the pallet to the roof

A pallet of 20 modules arrives at a terraced house with no side access. This is an illustrative walk-through, not advice for a real site.

HSE says to avoid hazardous manual handling so far as reasonably practicable, so the first question is whether anyone carries the pallet up at all. A hoist or telehandler, with a trained operator and a banksman, lifts it to the scaffold platform, within the load the scaffolder has rated it for (see job planning, access and logistics). OSHA says never climb a ladder carrying panels, so a hand carry up a ladder is ruled out.

What remains is the carry from the platform to where each module is fixed. HSE’s MAC tool covers carrying and team handling, and HSE says weight matters but the law sets no weight limit, so record shape, wind, distance and footing as well. To reduce the risk, two people carry each module, as typical module manuals say (check the manual for the module on the job), with a rule to stop carrying when gusts rise.

That becomes one RAMS row:

  • Hazard: a module carried near the roof edge.
  • At risk: the two carriers and anyone below.
  • Controls: hoist to the platform, two-person carry, edge protection on the scaffold (working at height and roof safety), a wind stop rule.
  • Residual risk: the carry on the roof still happens, so it depends on the edge protection staying in place.

The method statement lists the same controls in the order the crew works: weather check, scaffold check, hoist, carry, fix, clear up.

In our sample of 17 job postings (UK, US, Germany, India and Australia; how we research roadmaps), 5 US ones stated a 50 lb lift and 4 asked for OSHA 10 or 30 (all US; one required OSHA 30, for a Level 3 O&M role), so for a US job get the card and be ready to say how you would assess a lift.

Why last week’s pack will not do

MIS 3002 Issue 6.0, clause 5.1.5, requires suitable and sufficient risk assessments before any work on site starts. Its note says: PV work combines electric shock, falling and manual handling, rarely all at once. Roofers may not be used to shock, and electricians may not be used to handling large objects at height, so a pack needs both views, and its electrical steps follow electrical safety for DC and AC solar work.

Three slips make a pack useless:

  • Copying last week’s pack. The old roof was tiled; this garage roof is cement sheet. Check the pack against the survey, and if a material is unknown, stop and report it before anyone drills.
  • Hazards without controls. A row that ends at “fall from height” gives the crew nothing. End every row with a control, an owner and the residual risk.
  • Steps out of order. Hoisting before the scaffold is checked defeats the plan. Number the steps and brief them each morning.

What you will learn

  • The avoid, assess, reduce approach to manual handling, and when to use a hoist or a second person
  • How to write a simple risk assessment and method statement (RAMS, JSA or SWMS)
  • How heat illness, asbestos, first aid and lone working are handled on site
  • What a site induction covers and how to choose and check PPE
  • Which cards and certificates employers ask for in your country

The parts of this topic

Avoid, assess, reduceabout 1 hour

The three-step approach to manual handling: avoid the lift, assess what remains, reduce the risk with aids and help.

HSE says to avoid hazardous manual handling so far as reasonably practicable, assess the risk of any that cannot be avoided, and reduce the risk as low as reasonably practicable. Its MAC tool assesses lifting, lowering, carrying and team handling. HSE adds that weight matters but the law sets no specific weight limit. Awkward shape, wind, distance and a slippery roof all raise the risk too. On a roof job that can mean a delivery lifted to the roof edge by hoist instead of carried up a ladder, with a two-person carry for the last few metres.

Two-person lifts, hoists and telehandlersabout 1 hour

Use mechanical aids and trained operators; a lifting plan matters as much as the lift.

Use only the lifting aids you are trained on, and leave the rest to trained operators. OSHA's solar guidance says workers should never climb ladders carrying panels, and that ladder hoists, swing hoists or truck-mounted cranes and conveyors should be used wherever possible. One example is a telehandler with a trained operator and a banksman lifting a pallet of modules to the scaffold. In Great Britain the lifting regulations (LOLER) apply to lifting equipment, which must be planned, appropriate and inspected.

Risk assessments and method statements (RAMS, JSA, SWMS)about 1 hour

A risk assessment finds the hazards and controls; a method statement lists the steps in order. Names differ by country.

HSE sets out five steps for a risk assessment: identify hazards, assess the risks, control them, record your findings, review the controls. The assessment looks at what could cause harm, who might be harmed and what controls are needed. A method statement turns the controls into a safe order of work. Names differ: RAMS in the UK, JSA in the US, SWMS in Australia. A generic document fails: it must name this site, this roof and these people. A roof job's RAMS, for instance, covers access, edge protection, lifting, isolation and rescue, and is briefed to the crew each morning.

Heat illness and weather on siteabout 1 hour

Hot roofs, dark modules and heavy PPE raise the risk; employers must plan breaks, water and shade.

OSHA's heat guidance covers working in outdoor and indoor heat environments, and HSE's heat stress guidance covers recognising and managing the risk in Great Britain. A crew might start early, rotate roof and ground tasks and drink water at set intervals. Take early signs such as headache, cramps or confusion seriously, because heatstroke is a medical emergency, and report symptoms and look after workmates even when you would rather push on.

Asbestos awarenessabout 1 hour

Asbestos can be in older roofs, soffits and sheets; awareness training teaches you not to disturb it, not to work on it.

HSE says awareness training is for people such as roofers, electricians and construction workers who may disturb asbestos by accident, and that it does not qualify them to work on it. Asbestos-cement roof sheets are fragile as well as dangerous, so the fall and dust risks combine. Example: a surveyor flags corrugated cement sheeting and the plan changes to a different mounting approach. If you meet an unknown material, do not drill it: stop, report and get a competent person to assess.

First aid and lone workingabout 1 hour

Know where first aid is, who is trained and how you call for help, especially when working alone on a roof.

Never work alone on a roof without a way to call for help and someone who knows where you are. HSE's first aid guidance sets out the provision employers should make for workers, and its lone-worker guidance explains how to manage the risks of working alone. A crew should know the nearest hospital and have a charged phone and a first-aid kit; a roofing crew might also check in with the office at set times when one worker is off site.

Site induction and PPEabout 1 hour

An induction covers the site's hazards, rules, emergency arrangements and PPE; PPE must fit and be in good condition.

A site induction covers site hazards, access routes, welfare, emergency arrangements and rules on permits and PPE. PPE comes after removing the hazard, and damaged or ill-fitting kit should be replaced, not worn. HSE's PPE guidance says employers must make sure PPE is assessed as fit for purpose, maintained and stored properly, and that workers are shown how to use it; OSHA's solar page covers PPE for solar work. A start-of-day check might cover the hard hat, safety glasses, gloves suited to the task and safety footwear.

Certificates and cards: CSCS, OSHA 10/30, white cardabout 1 hour

Employers ask for site cards and safety courses; know what each proves and what it does not.

A card shows that training happened, not that you can do the work. In the UK a CSCS card shows a worker holds the right qualifications for site work, and CDM 2015 puts duties on contractors to make sure workers are competent. In the US, OSHA 10- and 30-hour Outreach cards are safety training, not certifications. In Australia the white card (general construction induction card) is the usual proof of induction training for construction work; in Victoria it comes only from an approved face-to-face course, and other states have their own rules. Example: an employer asking for OSHA 30 for a Level 3 O&M role.

Practice task

Write a RAMS pack for a fictional job: unloading, hoisting and installing 20 modules on a domestic roof. It needs a one-page risk assessment (hazards, who is at risk, controls, residual risk), a numbered method statement, a manual handling assessment for a module and a short site-induction checklist. Compare your risk assessment with the HSE template and note what you changed.

Skills you build

Manual handling assessmentRisk assessmentMethod statementsSite inductionPPE selectionAsbestos awareness

Resources for this topic

Every source here is free. Each link opens the provider's own site in a new tab.

Back to the whole roadmap

Live jobs

Live Solar PV technician jobs

Roles whose title matches this career path.

All Renewable Energy jobs

Spot a problem with this topic?

Tell us what is wrong, missing or unclear here. Your note is attached to this topic.

Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.