Medium-voltage awareness and authorisation
Medium-voltage equipment on a solar plant is switched, tested and entered only by authorised people. This page is awareness only: you will learn how permits and locks control it and where your role stops.
- Optional
- Advanced
- about 8 hours
Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps
Who may open the door of a transformer on a solar plant? Someone authorised for that equipment, and your part is to recognise, keep clear and ask. This topic is a map of boundaries, not a skill to practise. Name the equipment on the medium-voltage side, find out who holds authorisation for each piece and read the permit before you go near it. Nothing here authorises you to open, enter or work on live equipment.
When someone asks you to look inside a transformer
You are on the DC side of an inverter station at a made-up 20 MW plant under test, working under a permit that names that task. The site electrician, in a hurry, says: “The transformer door is ajar. Take a quick look inside and tell me if there is oil on the floor.”
- Read the permit, which lists what is isolated, who is in charge and the limits of the work area; lockout/tagout and permits to work explains how permits work. The transformer is outside your work area.
- Stop and keep clear. Do not touch the door, open it or look in.
- Say what you will not do and ask the question: “I am not authorised for that equipment. Who holds the permit for it?”
- Tell the permit holder or your supervisor what you saw, then go back to your own task.
The refusal costs the electrician a minute. The alternative puts you next to a hazard you cannot judge by looking, because medium-voltage equipment can seem dead and quiet while a fault releases very large energy.
The boundary of your role
The medium-voltage tests belong to certified testers, and commissioning and acceptance testing at scale shows where they sit in the plant’s sequence. Around them, your part is records, permits and keeping clear. Reading this page does not authorise you to work on medium-voltage equipment: that needs authorisation and training from your employer, within the licensing rules where you work.
Of the 17 postings we sampled (UK, US, Germany, India and Australia; how we research roadmaps), 3 of the 5 US postings asked for lockout/tagout or arc flash knowledge, all in commissioning or O&M roles, and 3 of the 5 named NFPA 70E, so for those roles read the current edition of NFPA 70E from NFPA. The arc hazard you are more likely to meet first, on DC and low-voltage equipment, is in arc flash, DC arcs and fire risk.
Does 1910.269 reach a plant that is still being built?
The scope paragraph of OSHA’s 29 CFR 1910.269 says it does not apply to construction work as defined in 1910.12, except for listed cases. One listed case is work involving electric power generation installations, which 29 CFR 1926.950(a)(3) says must comply with 1910.269. So do not assume a plant still being built sits outside it. Which US rules cover a given piece of work is a question for the site manager and your employer. Ask which rules and which permit system this site uses, and whether your employer’s authorisation covers work here.
What you will learn
- Why medium voltage is a different class of hazard from rooftop DC and domestic AC.
- What an authorised or qualified person is, and how permits and locks control access.
- How switching and isolation are done on medium-voltage equipment, and your role around it.
- What acceptance tests on medium-voltage cable, switchgear and transformers are for.
- How to recognise the boundary of your own authorisation and say no.
The parts of this topic
Medium-voltage hazardsabout 1 hour
Higher voltage can arc across air, releases far more fault energy and can leave dangerous charge in cables and equipment.
Definitions of medium and high voltage vary by country, so check yours. In the US, 29 CFR 1910.269 adds rules for work on equipment energised above 600 volts. At these levels you do not have to touch a conductor to be hurt: the voltage can bridge air gaps and a fault releases very large energy. A switchgear cabinet that is silent and unlit may still be live, so only the permit and the isolation records tell you its state, never how it looks. HSE's electricity pages describe how injury risk varies with voltage and circumstances.
- Electrical safety (topic index) HSE (United Kingdom) · Guide Index including electrical injuries and the legal framework
Authorised persons and permitsabout 1 hour
A permit or equivalent names what is isolated, who is in charge and who may enter; a verbal go-ahead is not a permit.
In the US, 1910.269 says only qualified employees may work on or with exposed energised lines or equipment, and that lines and equipment are treated as energised unless de-energised under its lockout or tagging rules. Other countries use similar roles under local names. A permit lists the isolation points, the person in charge and the limits of the work area, and a casual OK over the radio does not replace it. OSHA's electrical page links the arc flash and construction electrical pages.
- Electrical (OSHA) OSHA (United States) · Law or regulation Overview page that links the arc flash and construction electrical pages
Switching and isolationabout 1 hour
Authorised operators switch medium-voltage equipment to a programme; your role is to recognise locks and tags and never disturb them.
OSHA's page says 1910.147 covers general industry and that hazardous-energy control also appears in standards for construction electrical work and for electric power generation, transmission and distribution. 1910.269 requires at least two employees for certain work on equipment energised above 600 volts. Switching programmes fix the order of isolating, proving dead and earthing. Your part is to read the permit, recognise locks and keep clear. Example: you find a lock on the station door that is not yours, so you leave it and ask its owner.
- Control of hazardous energy (lockout/tagout) OSHA (United States) · Law or regulation
Acceptance testing of medium-voltage equipmentabout 2 hours
Cables, switchgear and transformers get specialist tests before energisation; these are for certified testers, not PV technicians.
ANSI/NETA ATS covers acceptance testing specifications for electrical power equipment and systems and is a paid standard, so check the current text. Which tests apply to a given cable, switchgear or transformer comes from that kind of specification and the design. A low-voltage insulation tester does not prove a medium-voltage cable; on the collector cable, a specialist test comes before the plant is connected. NETA also runs technician certification.
Medium-voltage arc flashabout 1 hour
Arc flash releases heat, light and pressure; at medium voltage the energy is far higher, so boundaries and protective clothing matter.
An arc flash is an explosive release of energy when current jumps through air. It is a hazard on low-voltage and DC equipment too, but energy at medium voltage is much higher. 1910.269 has requirements for arc-rated clothing. A site may issue arc-rated clothing and still expect isolation to be proved first: clothing is the last layer, never a substitute. NFPA 70E is the usual US workplace standard for boundaries and protective categories; this page does not quote it, so read the current edition from NFPA.
The limits of the PV technician roleabout 2 hours
Know where your authorisation ends, ask who holds the permit and say no when asked to step outside it.
HSE's HSR25 explains how the UK Electricity at Work Regulations 1989 apply to all work activities and how dutyholders can meet them. Good practice is to know your handover boundary, ask who holds the permit for the area and decline work outside your authorisation. Asked to just open a transformer door and look inside, you say no without the right authorisation: saying yes to avoid awkwardness puts you and others at risk.
- HSR25: memorandum of guidance on the Electricity at Work Regulations 1989 HSE (United Kingdom) · Guide Free download; UK
Practice task
Write a one-page boundary note for a fictional 20 MW plant: list the equipment on the medium-voltage side, who holds authorisation for it, what a PV technician may do (recognise, keep clear, witness, read permits) and what they may not do. Add three questions you would ask the site manager before starting work near the inverter station. This is a desk task: do not enter or open any medium-voltage equipment to complete it.
Skills you build
Medium-voltage hazard awarenessPermit and lock awarenessAcceptance testing awarenessKnowing the limits of authorisation
Resources for this topic
Every source here is free. Each link opens the provider's own site in a new tab.
- NETA: InterNational Electrical Testing Association NETA · Community Standards, accredited companies and technician certification; some documents are paid
- 29 CFR 1910.269: electric power generation, transmission and distribution OSHA (United States) · Law or regulation Excludes most construction work; read it to see how qualified persons and energised work are treated
- Construction industry (OSHA) OSHA (United States) · Law or regulation Entry page to US construction safety rules and guidance
- 2023 NEC and photovoltaic power systems IAEI Magazine · Guide Summary of changes including Article 691 on large-scale PV
Latest Renewable Energy jobs
No title matches the role right now, so these are the latest jobs in the same category.
No live jobs to show right now. Check back soon, or browse every green job.
Spot a problem with this topic?
Tell us what is wrong, missing or unclear here. Your note is attached to this topic.
Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.