Cables, connectors, protection and earthing
The wiring and protection between modules and inverter: PV cable, connectors, DC protection, surge and lightning protection, earthing and labels. You will know what each must be rated for and which choices need a competent designer.
- Core
- Intermediate
- about 12 hours
Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps
Trace the current from the module along the string cable to the combiner or inverter, then out along the AC side, and ask three things at every part: is it rated for DC where it carries DC, who decides its size or whether it is needed, and how will the next person identify it? Sizing, earthing and surge protection belong to a competent designer, who signs them. Your job is to build what the design says with the right parts (DC wiring, connectors and labelling covers how), and to report what looks wrong.
When a longer run changes the cable
A string carrying 9 A at 340 V runs 30 m each way to the inverter, so the current travels 60 m round trip. At 5.0 milliohms of resistance per metre, that is 60 x 0.005 = 0.30 ohms, and the voltage drop is 9 x 0.30 = 2.7 V, which is 2.7 / 340 = 0.79 percent of the string voltage. The figures are all made up for the example, and the cable resistance is not from a real data sheet: real values come from the cable maker and the design.
Now move the inverter so the run is 60 m each way. The round trip is 120 m, so the resistance is 0.60 ohms, the drop is 9 x 0.60 = 5.4 V, or 5.4 / 340 = 1.59 percent. If the designer’s target is 1 percent, the choices are a cable with lower resistance per metre (half the resistance, 2.5 milliohms per metre, brings it back to 120 x 0.0025 = 0.30 ohms and 0.79 percent) or a different layout. The 1 percent here is only a round number. For the AC circuit, the note to MIS 3002 Issue 6.0, clause 5.6.8, says 1 percent is considered practicable for most domestic small-scale installations and up to 3 percent for larger systems or long runs. The DC target comes from the design, and the string voltages that set the ratings come from string, inverter and cable design.
Decisions that are recorded, not assumed
Frame earthing, surge protection and RCD type should all appear on paper before anyone fits them.
- Frame earthing: if the designer decides against earthing the array frame, MIS 3002 says the justification shall be recorded (clause 5.3.2).
- Surge protection: protection must be provided unless the owner is prepared to tolerate the risk, and the standard says not to assume the inverter includes it (5.3.3).
- RCD type: the inverter manual and the design say which.
If the paperwork is silent, ask the designer rather than choose. Isolating before touching any of this wiring is covered in electrical safety for DC and AC solar work.
What you will learn
- What makes a cable suitable for PV: DC rating, UV and temperature range, current and voltage drop
- Why connectors must be matched and assembled with the correct tools
- What combiner boxes, DC isolators, DC-rated fuses and breakers do
- How surge protection, lightning protection and RCD choice are decided
- How array frames are bonded or earthed and why the decision is recorded
- What good labelling looks like for the next person who has to isolate the system
The parts of this topic
PV cable ratingsabout 1 hour
Choose cable rated for DC, sunlight, outdoor temperature and the current and voltage drop of the string.
A PV string cable carries direct current at a few hundred volts, outdoors, in sun and weather, for decades, so it needs insulation rated for DC voltage, UV and temperature range as well as current. Avoid indoor cable outdoors, and cable sized only for current. Resistance in long runs wastes power: the Sandia guide describes DC wiring losses. The designer picks a cross-section so a long string run stays within the voltage drop target.
- PVPMC: DC wiring losses Sandia National Laboratories · Guide
Matched connectors and assemblyabout 1 hour
Only mate connectors approved for each other, and assemble them with the maker's tool and procedure.
MIS 3002 says DC connectors shall be assembled with the correct tools and procedures (its note names wrong crimping tools as a significant contributing factor to connection failure and even fires), should be protected from water for the life of the system, and that mounting parts shall be approved to work together. Mating connectors from different makers because they fit is a risk: a poor contact heats up and can arc. A sound example is connectors from the same maker, crimped with the maker's tool.
Combiner boxes and DC isolatorsabout 1 hour
Combiners join strings; isolators let a qualified person disconnect DC. Both must be rated for the DC voltage and current.
A combiner box joins parallel strings, often with fuses, before the cable run to the inverter, and a DC isolator lets a qualified person disconnect the DC side. Isolating at the isolator does not de-energise the array side: the modules and cables up to it stay live in daylight. Only DC-rated switches belong on DC circuits. The Sandia guide lists combiner boxes, disconnects and fuses among the DC components whose failures reduce performance. Example: a rated isolator sited near the inverter and labelled.
- PVPMC: DC component health Sandia National Laboratories · Guide
DC fuses and breakersabout 1 hour
Overcurrent devices on DC circuits must be rated for DC voltage; the design says where they are needed.
Fuses and breakers protect cables from overcurrent. DC is harder to interrupt than AC because the current never crosses zero, so the device must carry a DC voltage and current rating, and an AC fuse or breaker of the same size is not a substitute. Whether a string needs a fuse depends on how many strings are in parallel and on the module's maximum series fuse rating, which the design checks. In a combiner, for example, the fuses carry a rated DC voltage.
- Fuse Energy Education (University of Calgary) · Guide
- Circuit breaker Energy Education (University of Calgary) · Guide
Surge protectionabout 1 hour
Surge protective devices limit transient overvoltages; the code says when they are needed and the inverter may not include them.
MIS 3002 says BS 7671 sets out when protection against transient overvoltage must be provided, and that even where the code does not require it, protection must still be provided unless the owner is prepared to tolerate the risk. Its note adds that some inverters include suitable protection but this should not be assumed, so do not count on the inverter to do it for you. The design says where each surge protective device goes: for example one on the AC side and one on the DC side.
- MIS 3002:2025 Issue 2.0 (redeveloped MCS scheme) MCS · Standard Clause 3.3.3 in this issue (5.3.3 in Issue 6.0).
RCD choiceabout 1 hour
The RCD type must suit the inverter; the inverter manual and the code say which, because wrong types can fail to trip.
An RCD trips on leakage to earth, and RCD types (type A and type B, for example) differ in which kinds of DC residual current they can detect. Some inverters need a particular type or have their own monitoring, so the inverter manual, the design and the code state which RCD to fit. An unsuitable type can fail to trip in a fault, so fit what is specified, not the usual RCD. IEC 62109-2 covers the safety of PV inverters. In practice the installer reads the manual and the design, then the electrician fits the specified RCD.
- Residual-current device Wikipedia · Guide General explainer; trip ratings and rules are set by your local code.
Array frame earthing and bondingabout 1 hour
The designer decides whether the array frame is earthed or bonded, and records the reason if not.
Array frames and rails are metal and can become live if insulation fails. MIS 3002 says that if the designer decides not to provide protective or functional earthing of the array frame, justification shall be recorded, and its note says the code's decision tree would normally lead to earthing. Class II modules are not a reason to skip bonding: it is a recorded design decision, not a shortcut. One design bonds the frames to the main earth with correctly sized cable and rated clips.
- Grounding Energy Education (University of Calgary) · Guide
Lightning protectionabout 1 hour
Lightning risk is assessed, not assumed; where an external system exists, the PV frame must be considered with it.
The lightning standard IEC 62305 gives the principles for assessing risk and protecting structures, and the UPNEDA primer lists IEC 62305 in its Indian standards list for rooftop systems. MIS 3002 refers to a lightning risk assessment and a decision, and notes that transient overvoltage protection may still be needed. Example: a building with an existing air termination where the array's position and bonding must match. Do not add rods to a roof without a design.
- Solar rooftop primer for vendors, 3 kW (UPNEDA) UPNEDA (Uttar Pradesh, India) · Guide A state agency primer; shows the Indian standards a vendor is expected to follow.
Labellingabout 1 hour
Labels tell the next person what the circuit is, where the isolators are and what to do in an emergency.
Good labels identify the PV circuits, the isolators, the inverter, the battery and the shutdown steps, in a form that survives weather; a handwritten label that fades within a year lets down the next person. IEC 62446-1 covers documentation and inspection of grid-connected systems, and MIS 3002's commissioning checklist includes labelling and signage, a system schematic and a visible emergency shutdown procedure. Example: a label at the consumer unit and one at the meter.
Practice task
Take a fictional 4 kWp roof system with two strings. On one page, draw the single-line diagram, then list each cable, connector, isolator, fuse or surge device it needs, the rating you would ask for, and the label that goes on it. Mark the places where the design needs a qualified electrician's decision (earthing, surge protection, RCD type) rather than a beginner's choice. Have a qualified electrician or tutor review it.
Skills you build
PV cable selectionDC connector qualityDC protection devicesSurge protectionFrame earthing and bondingLabelling
Resources for this topic
Every source here is free. Each link opens the provider's own site in a new tab.
- 2023 National Electrical Code and photovoltaic power systems IAEI Magazine · Guide Trade-magazine summary of the 2023 NEC changes; adoption varies by state.
- Wiring Unlimited: the book on cabling and DC systems (Victron Energy) Victron Energy · Book Written for battery and low-voltage DC systems; the cable, fuse and voltage-drop ideas apply, the numbers do not transfer to PV strings.
- MIS 3002 Issue 6.0: the Solar PV Standard (Installation) MCS · Standard Free to read. Dated 18 March 2026; mandatory for contractors certified under it from 18 June 2026. The library also lists a redeveloped MIS 3002:2025 Issue 2.0, so check which one your employer is certified to.
Jobs related to Solar PV technician
No title matches the role itself right now, so these are live jobs in the same field.
Spot a problem with this topic?
Tell us what is wrong, missing or unclear here. Your note is attached to this topic.
Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.