Voltage comes first because the datasheet limit is a maximum, and its worst case is a cold, bright morning, not midday. The order is voltage, then current, then losses and protection, and only then the drawing. All of this is paper work. A design is not a safe basis for building until a competent, qualified person has checked it.
Why 14 modules pass at test conditions and fail in the cold
A designer wants one string of 14 modules. Every number here is invented for the example: real values come from the datasheets (PV modules and datasheet reading, inverters, optimisers and microinverters) and the site’s design temperatures. The module has Voc 41.5 V at standard test conditions and a Voc coefficient of -0.28% per degree C. The site’s coldest design temperature is -10 degrees C. The inverter takes at most 600 V on its DC input, its MPPT window starts at 150 V, and each of its two inputs allows 15 A short-circuit current.
How much does Voc rise on the coldest morning? -10 is 35 degrees below 25, so Voc rises by 0.28% x 35 = 9.8%, and 41.5 x 1.098 = about 45.6 V per module.
How long can the string be? 600 / 45.6 = 13.2, so 13 modules at most. A string of 14 reaches 14 x 45.6 = about 638 V. At standard test conditions it looks fine (14 x 41.5 = 581 V), which is how the error slips through.
Do two strings of 7 work? Cold, each reaches 7 x 45.6 = about 319 V, inside the limit. (The module’s own maximum system voltage is a second ceiling to check.) On the hot side, if the datasheet gives a hot-day working voltage of 28 V per module, 7 x 28 = 196 V, above the 150 V floor of the window.
And the current? Each string’s Isc is taken as 11.5 A. Two strings on separate inputs are fine. Both on one input would carry 23 A against a 15 A limit.
Reading someone else’s design before you build from it
If you are an installer rather than the designer, you still check three things against the datasheets before the roof is loaded: string length against the cold-voltage limit, strings per input against the current limit, and the drawing against the parts delivered. The cable and protection choices behind the drawing are covered in cables, connectors, protection and earthing.
If something does not fit, report it to the designer or supervisor before a cable is cut or a module fixed. Do not shorten or regroup a string on the roof to make it fit. That is a change to the design and needs the designer’s check.
Any electrical work built from a design must be done within your local licensing rules.
What you will learn
- Check a string's coldest-day open-circuit voltage against module and inverter maximums, and its hot-day operating voltage against the inverter's MPPT window
- Check string current against each inverter input's limits and decide how many strings share an input
- Choose a DC/AC ratio and understand what clipping is and costs
- Calculate DC and AC voltage drop and compare it with the targets in the scheme standard (MIS 3002: about 1% for most domestic work, up to 3% for larger systems, on the AC side)
- Choose protective devices and an earthing and surge-protection approach, and draw a single-line diagram an installer can build from
The parts of this topic
Voltage limits: cold Voc and the MPPT windowabout 3 hours
Module voltage rises in the cold and falls with heat. Size strings so cold Voc stays under every maximum and hot working voltage stays inside the inverter's MPPT range.
A sample question in the California C-46 guide states that module voltage decreases as temperature rises, so the cold morning is the dangerous one for maximum voltage. With an illustrative coefficient of -0.28% per degree C, a module 25 degrees below the 25 degree test condition shows about 7% more Voc (0.28 x 25). A string checked only at standard test condition voltage can exceed a limit on a cold morning, so use the datasheet coefficient and the site's design temperatures.
- California Solar (C-46) licence exam study guide California Contractors State License Board · Guide Includes sample exam questions on PV voltage, current and temperature.
Current limits and strings per MPPT inputabout 2 hours
Each inverter input has a maximum operating current and a maximum short-circuit current. Count the strings on each input and check both limits.
Strings on one MPPT input add their currents, so two strings of the same type double the current seen by that input, and adding one more to use up roof space means re-checking the input limits first. Compare the module's Isc, and the number of strings, with the input limits on the inverter datasheet. IEC 62548-1 covers array wiring, protective devices, switching and earthing, so protection for parallel strings is found there and in the inverter manual.
DC/AC ratio and clippingabout 2 hours
An array can be rated above the inverter's AC output; the surplus is clipped on the best days. The array's maximum voltage and short-circuit current must still stay within the inverter's limits.
PVPMC explains that clipping occurs when array DC power exceeds the inverter's maximum input; the inverter raises DC voltage above the maximum power point to shed power. A 5 kWp array on a 4 kW inverter, for instance, has a DC/AC ratio of 1.25 (5 / 4) and loses a little at midsummer noon but gains in winter and mornings. A high ratio is not free, so check the inverter's limits and the manufacturer's allowed range before settling on one.
- PVPMC: inverter saturation or clipping Sandia National Laboratories · Guide Mentions thermal limiting too.
Mismatch and string layoutabout 2 hours
Modules in a string share one current, so shade or different orientations on one string pull the whole string down. Group like with like on each MPPT input.
PVPMC says series strings share one current and parallel strings one voltage, so devices are forced off their best operating point, and that mismatch from shading is often modelled separately from mismatch caused by module differences. Mixing orientations on one string saves cable but pulls the whole string down, so put east and west roof faces on separate inputs or use module-level electronics, and keep partly shaded modules together.
- PVPMC: array utilization Sandia National Laboratories · Guide How well the MPPT keeps the array at its best point.
DC and AC voltage dropabout 2 hours
Cable resistance wastes energy, and on the AC side a high drop can push the inverter over its voltage limit and trip it. MIS 3002 uses 1% for most domestic work and up to 3% for larger systems.
On the AC side, MIS 3002 issue 6.0 says cables should be sized to minimise voltage drop measured from the supplier's cut-out to the inverter's AC terminals, with about 1% practicable for most domestic installations and up to 3% for larger systems or long runs; the aims are less loss and no nuisance over-voltage trips. At 230 V, 1% is 2.3 V. PVPMC notes DC losses scale with current squared. Measure from the cut-out, not only from inverter to board.
- PVPMC: DC wiring losses Sandia National Laboratories · Guide I-squared-R loss and string mismatch from unequal cables.
- PVPMC: AC wiring losses Sandia National Laboratories · Guide Mostly relevant to larger plants; residential losses are usually small.
Protection, earthing and surge protectionabout 2 hours
Choose and record how the array frame is earthed or bonded, whether surge protection is fitted, and which devices protect each circuit. Write down any decision not to fit one.
Where the designer decides not to give the array frame protective or functional earthing, MIS 3002 issue 6.0 says the justification must be recorded, and that surge protection must be provided unless the owner accepts the risk, even where the wiring code does not strictly require it. The UPNEDA primer names IEC 61643-11 for surge protection and IEC 62305 for lightning protection. Whatever you decide, write the decision down.
- Rooftop solar primer for vendors, 3 kW UPNEDA, Uttar Pradesh · Guide India. A bill of materials with the standards each part should meet.
Single-line and layout drawingsabout 1 hour
A single-line diagram shows strings, inverter, protective devices, isolators, meter and connection point; the layout drawing shows module positions. In the UK the layout drawing must reach the customer before contract.
The technical information given to the customer in writing at or before contract includes, according to MIS 3002 issue 6.0, the module datasheets, inverter datasheet and a drawing of the proposed module layout. Label every device with its rating and cable size so an installer can build from the drawing without guessing. A drawing of boxes without ratings or cable sizes is not enough to build from.
- OpenSolar design tools OpenSolar · Tool The page describes the software as free and lists single line diagram and mounting design tools.
Practice task
On paper, design a 4.5 kWp domestic system from a real module datasheet and a real inverter datasheet: work out the range of modules per string using the Voc temperature coefficient, check the voltage and current limits, estimate AC cable voltage drop for a stated run, and draw a single-line diagram with every device labelled. Ask a qualified person to review it; never build from your own unreviewed design.
Skills you build
String sizingVoltage-drop calculationDC/AC ratioSingle-line diagrams
Resources for this topic
Every source here is free. Each link opens the provider's own site in a new tab.
- MIS 3002 Issue 6.0, sections 5.3 and 5.6 (design and installation) MCS · Standard Free for personal use. Covers frame earthing justification, surge protection, arc-fault function, voltage-drop targets.
- NABCEP PV Installation Professional Resource Guide NABCEP · Guide Chapter 2 verifies a system design. 2016 edition, based on the 2014 NEC.
- 2023 National Electrical Code and photovoltaic power systems IAEI Magazine · Guide US. Notes new DC circuit marking and wiring changes in Article 690.
Jobs related to Solar PV technician
No title matches the role itself right now, so these are live jobs in the same field.
Spot a problem with this topic?
Tell us what is wrong, missing or unclear here. Your note is attached to this topic.
Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.