Estimating, quoting and proposals
Price a solar job from the design: count the parts, estimate labour, add overheads and margin, check incentives on the day and show payback as a range. You will be able to build and check a quote.
- Optional
- Intermediate
- about 8 hours
Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps
Quoting runs in a fixed order: count the parts from the design, add access costs, estimate labour from past jobs, then add overheads, margin and tax, and check incentives on the day. Last, test the savings story against a low, central and high case. The proposal then shows the price and the assumptions behind it together, so the customer can see what the savings depend on.
The same roof, three paybacks
A system costs 6,000 pounds and is expected to produce 3,600 kWh a year. All the numbers in this example are made up for the sums, not real prices, tariffs or yields.
- Central case: 40% is used on site, so 3,600 x 0.4 = 1,440 kWh at 0.25 pounds per kWh = 360 pounds. The other 2,160 kWh are exported at 0.05 = 108 pounds. Saving 468 pounds a year, so payback is 6,000 / 468 = 12.8 years.
- Low case: 30% used on site, 1,080 kWh at 0.20 = 216 pounds. Exports of 2,520 kWh at 0.03 = 75.60 pounds. Saving 291.60 a year, payback 6,000 / 291.60 = 20.6 years.
- High case: 50% used on site, 1,800 kWh at 0.30 = 540 pounds. Exports of 1,800 kWh at 0.07 = 126 pounds. Saving 666 a year, payback 6,000 / 666 = 9.0 years.
The same roof and the same panels give anything from 9 to 21 years, depending on how the customer uses the power and what the tariffs do. Quoting “12.8 years” alone would hide that. The sums also leave out panel degradation, maintenance and finance costs, which all lengthen the payback. Tools such as PVGIS give the yield input, and sizing, yield estimates and losses covers the loss figures behind it; the rest comes from the customer’s bills and the export scheme.
A quote is only as good as the survey behind it
A quote built on a survey that records the roof but not the electrical supply can fall apart at the design stage, when the consumer unit or the supply turns out not to suit the system. Check what the survey captured before you price (site and roof survey lists what to collect), and list exclusions such as meter changes and consumer unit upgrades in the proposal.
Free tools for the proposal itself are compared in design and estimating tools. Check which licence, insurance and consumer-protection rules apply to quotes and contracts where you work, because they differ by place; what a customer should receive after the job is in handover pack, certificates and registration.
What you will learn
- How to build a quote from the design: parts, waste, access costs, labour hours and contingency.
- How overheads, margin, tax and incentives enter a price, and why incentive rules must be checked on the day.
- How to estimate yield and payback honestly, with a range and stated assumptions.
- What a clear proposal contains, and what it should exclude.
- How warranty terms and change orders protect both the customer and the firm.
The parts of this topic
Bill of materials and labour hoursabout 2 hours
Count every part from the design, add waste and access costs, then estimate labour from past jobs, with contingency.
Start from the design: modules, rails, hooks, clamps, cable, fuses, isolators, labels and consumables, with a waste allowance. Add access costs such as scaffold and hoist, then labour hours by task from past jobs. The California C-46 exam guide lists estimating job costs inside its planning and estimating area, about 14% of the exam. Count parts and access, rather than pricing from the headline kWp. Example: a roof job at two days with two people plus a half-day of contingency.
- C-46 Solar examination study guide California Contractors State License Board · Guide For exams on or after 1 July 2023
Margin, tax, incentives and financeabout 2 hours
A price covers direct cost, overheads and margin, shows tax correctly and rests on incentives that must be checked on the day.
The IRS page, updated 4 July 2026, says the US residential clean energy credit is not available for property placed in service after 31 December 2025, so a quote that assumed it would now be wrong for a new install. Business credits, UK tax treatment and local incentives are separate, so read the current rule for your place on the day, and never build a quote on an incentive without checking it is still open. Financing such as loans or leases changes what the customer pays each month.
- Residential clean energy credit IRS (United States) · Law or regulation US residential credit only; moving rules, so check the current page
Yield and payback inputsabout 2 hours
A believable payback needs a yield estimate, import price, export payment and self-consumption share, shown as a range.
PVGIS, a free tool from the European Commission's research centre, estimates yield for a site. Export payments depend on the scheme: in Great Britain the Smart Export Guarantee requires some suppliers to pay eligible small generators for exported electricity at rates the supplier sets above zero. Show the customer a range, not one number: low, central and high cases for tariff and usage. A payback promised on a rate that may change next year is a promise you cannot keep.
- PVGIS: PV potential tools European Commission Joint Research Centre · Tool
- Smart Export Guarantee Ofgem (Great Britain) · Law or regulation
Writing a proposalabout 1 hour
A proposal shows the design, expected output, price, terms and next steps, with assumptions stated and exclusions clear.
O*NET's profile for solar sales representatives and assessors lists preparing proposals, quotes and contracts, selecting systems for a customer's needs and site, and calculating likely output. Keep claims honest: state the assumptions on shading, tilt, tariff and usage, and what is excluded, such as scaffold, meter changes or consumer unit upgrades. A one-page summary on top with details beneath is one layout, and the assumptions belong where the customer will see them, not at the back.
- Solar sales representatives and assessors (O*NET OnLine) US Department of Labor · Guide
Warranty terms and change ordersabout 1 hour
Separate the workmanship and product warranties and record every agreed change to scope, price and time before the work.
State the workmanship warranty, the product warranties and who the customer calls for each. MCS tells UK customers they should get an MCS certificate within 10 working days and a handover pack with product details and the workmanship warranty. Warranty terms differ by maker and country; Enphase's warranty hub lists them by region. A change order records an agreed change before work starts. Example: extra cable run agreed in writing, with its price, before the crew does it, not argued over afterwards.
- MCS: battery storage for your home MCS · Guide UK consumer page showing the certificate and handover pack expectations
- Enphase installer warranty pages Enphase Energy · Guide Navigation hub that links country warranty pages
Practice task
Build a quote for a fictional 4 kWp roof system: a bill of materials priced from public catalogue pages, labour hours by task, overheads, margin, a tax line, a one-page assumptions list and a payback range. Produce a proposal from it using a free design tool, and add a one-page change-order template. Keep all figures in a spreadsheet so each assumption can be changed. Desk work only; no customer or site is needed.
Skills you build
Bill of materialsLabour estimatingProposal writingPayback assumptionsChange orders
Resources for this topic
Every source here is free. Each link opens the provider's own site in a new tab.
- MCS consumer complaints MCS · Guide UK; shows what customers can do when a quote or install goes wrong
- Solar photovoltaic installers (Occupational Outlook Handbook) US Bureau of Labor Statistics · Guide US median pay for May 2025, a baseline for labour costing
Live Solar PV technician jobs
Roles whose title matches this career path.
Spot a problem with this topic?
Tell us what is wrong, missing or unclear here. Your note is attached to this topic.
Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.