Project: a full Scope 1-3 inventory
Build a documented greenhouse gas inventory for a real or realistic organisation: boundary note, data request, calculation workbook, checks, method note and a one-page summary, reviewed by someone else.
- Core
- Intermediate
- about 30 hours
Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps
Fix the design before you touch any data. Write the boundary, base year and recalculation rule on one page, send each data owner a request they can answer without a call, build the workbook in separate input, factor, calculation, check and output tabs, then ask someone else to try to break it. A small inventory that is finished and reviewed beats a large one left half done.
A twelve-person studio, from boundary to check
A design studio rents one floor and pays its own electricity bill. The studio is imaginary and so is every number below, including the factor.
- Boundary note. Operational control, calendar year, one site. Electricity is in. The studio owns no vehicles. Flights go to Scope 3 category 6, and purchased goods are screened but not yet calculated.
- Data request. Finance receives a pre-filled table of the studio’s utility accounts and confirms twelve monthly bills, each marked “estimated” or “actual”.
- Calculation row. Electricity of 18,000 kWh x 0.20 kg CO2e per kWh = 3,600 kg, or 3.6 tonnes, with the factor ID beside it. That is the location-based figure; the second Scope 2 figure needs a supplier or residual-mix factor from your factor dataset.
- Check tab. Only eleven bills arrive, and November is missing. Estimate it as the average of October (1,500 kWh) and December (1,700 kWh): (1,500 + 1,700) / 2 = 1,600 kWh. Log it as “estimated, range about plus or minus 10%”, a rough range you chose and wrote down.
- Review. A friend re-performs three calculations and traces three inputs to a bill. They find an electricity bill filed under the wrong year. The fix goes in the restatement log with old and new values.
Pick something you can finish
Choose one or two sites and bills you can get. If you cannot find an organisation, use a school, a club, a small shop or yourself as a model, and say in the method note that it is a practice case. Check refrigerant top-ups, which are easy to leave out of Scope 1. When it is done, put the cleaned-up result in your portfolio. A gap you document is better than a number you guessed and hid.
What you will learn
- Turn the GHG Protocol rules into a project plan with a boundary, base year, data owners and deadlines.
- Write a data request that sites or suppliers can answer correctly without a phone call.
- Build a calculation workbook with inputs, factors, calculations, checks and outputs.
- Log every estimate and its uncertainty, and write a method note that explains choices and limits.
- Ask a peer to review the work and record what they found.
The parts of this topic
Boundary, base year and planabout 3 hours
Decide what is in the inventory and why, before collecting a single number.
Write a one-page design first: the consolidation approach, the sites and activities included and excluded with reasons, the reporting year, the base year, the gases and GWP set, and the recalculation rule. This is the decision log you will defend later. Write it before you collect data, or the boundary will quietly bend to fit whatever data you happen to have. Example: 'Operational control; the leased warehouse is in because we pay its energy bills; franchises excluded as immaterial'.
- Determine organizational boundaries US EPA Center for Corporate Climate Leadership · Guide
Data request sheetabout 4 hours
A clear form that tells each data owner what to send, in which unit, for which period, by when.
A data request lists each item (litres of diesel, kWh by meter, refrigerant top-ups), its unit, period, owner, deadline and format, with a column for 'estimated or actual'. The EPA offers a simplified inventory management plan form and a checklist you can use as templates. Sending finance a pre-filled table of utility accounts to confirm and complete works better than an open email asking for 'all energy data', which gets a different format back from every site.
- Simplified inventory management plan form US EPA · Template
- Inventory management plan checklist US EPA · Template
Calculation workbookabout 8 hours
Inputs, factors, calculations, checks and outputs on separate tabs, with every factor sourced.
Use the structure from the spreadsheet topic: raw activity data on an input tab, a factor register with source and year, a calculation tab using lookups, a check tab and a clean output tab by scope and category. The EPA Hub is one source of factors; the UK file is another. Each calculation row shows the activity, the unit, the factor ID and the result in tonnes CO2e. Keep assumptions visible in cells, not buried in formulas, and never overwrite inputs after review, or the result cannot be reproduced.
- GHG Emission Factors Hub US EPA · Dataset
Scope 3 screening and two categoriesabout 5 hours
Screen all 15 categories, then calculate at least two with the best data you can get.
Estimate all 15 categories roughly, rank them, and write down why any are excluded. Then pick two to calculate properly, such as business travel and purchased goods or waste. The GHG Protocol's detailed Scope 3 FAQ explains how to screen with initial estimates; its free Scope 3 Evaluator tool has been retired. Example: a spend-based estimate for purchased goods and an activity-based one for flights. Leave time for the method note, and do not report an unscreened Scope 3 as complete.
- Scope 3 Standard: detailed FAQ GHG Protocol · Guide 22 pages; see the sections on prioritising activities and initial screening.
Checks, estimates and uncertainty logabout 4 hours
Prove the totals tie out, and record every estimate with the reason and its likely accuracy.
Add tests: totals by site equal totals by fuel, no negative values, year-on-year changes above a set percentage are explained. Keep an estimates log listing each assumption, why it was needed (a missing bill, an unknown fuel), how it was estimated and a rough range, and never present an estimate as a measurement. The Corporate Standard has a chapter on managing inventory quality. An entry might read: 'June gas for Site C estimated from May; plus or minus 10%'.
- GHG Protocol Corporate Accounting and Reporting Standard (revised edition) GHG Protocol · Standard
- Financial Modelling Code ICAEW · Standard Principles for robust spreadsheets; useful when you write your check tab.
Method note and one-page summaryabout 4 hours
A short document that explains the boundary, methods, factors and limits, and a one-page summary for non-specialists.
The method note covers the boundary, base year, scopes and categories included, gases and GWP set, methods and factors with sources, estimates and exclusions. The GHG Protocol reporting template is a good skeleton. The one-page summary gives the total by scope, the largest sources, the year-on-year change and the three biggest limitations in plain words. A chart of emissions by scope beside a short 'what this means' is one layout. A summary that shows the number without the caveats misleads.
- GHG Protocol reporting template (Word) GHG Protocol · Template
Restatement logabout 2 hours
A record of every change made to a published number, with the date, reason and effect.
A restatement log lists corrections and recalculations: what changed, why (an error found, an acquisition, a method update), the old and new values, and who approved it. It supports the GHG Protocol's idea of recalculating the base year for structural changes. The log exists to stop numbers changing quietly while others still use the earlier version. An invented entry shows the shape: 'Dec 2026: Site D electricity corrected from MWh to kWh; total Scope 2 reduced by 2.1%'.
- Base year recalculation methodologies for structural changes (Appendix E) GHG Protocol · Standard
Peer reviewabout 2 hours
Ask someone to review your inventory as an assurance provider would, and record what they find.
Give a reviewer the boundary note, workbook, method note and evidence for a sample of inputs, and ask them to re-perform three calculations and trace three inputs to source. Assurance providers do something similar when they review sustainability information; the International Auditing and Assurance Standards Board has issued ISSA 5000 as its standard for sustainability assurance. Tell the reviewer what to test: 'have a look' gets you a polite read, not a review. Your reviewer might, for instance, find a unit error in one site.
- Understanding ISSA 5000 IAASB · Guide Background on assurance expectations; see the Stage 7 topic on assurance readiness.
Practice task
Choose a real organisation (a school, a small business, a club, or your own household treated as a small business) and complete a full inventory for one year: Scope 1 and 2 with both Scope 2 methods, a screened Scope 3 with at least two categories calculated, a check tab, an estimates log, a restatement log, a method note of two to four pages and a one-page summary. Ask someone else to review it and publish the result, anonymised if needed.
Skills you build
Inventory designData requestsCalculation workbooksUncertainty logsMethod notesPeer review
Resources for this topic
Every source here is free. Each link opens the provider's own site in a new tab.
- Simplified GHG Emissions Calculator US EPA Center for Corporate Climate Leadership · Tool A free Excel calculator useful to cross-check your own workbook.
- Corporate Standard GHG Protocol · Standard
- Corporate Value Chain (Scope 3) Standard GHG Protocol · Standard
- UK government conversion factors for company reporting UK Government (DESNZ) · Dataset
Live ESG analyst jobs
Roles whose title matches this career path.
Spot a problem with this topic?
Tell us what is wrong, missing or unclear here. Your note is attached to this topic.
Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.