Everything on a Great Britain construction site follows from who appoints whom. Draw the duty-holder map first: the plan, the inductions and the coordination all depend on it. Then write the construction phase plan from that map, and use the site controls and the weekly coordination meeting to keep the plan true once work starts.
Who is in charge on a shop refit?
Who is in charge of safety when a shop owner refits a unit and hires an electrician and a shopfitter? With two contractors, a principal designer and a principal contractor must be appointed under CDM 2015, as HSE describes (the shop is invented, and none of this is advice for a real site).
The owner is a commercial client, so the owner appoints them and makes sure they carry out their duties. The owner cannot say “the shopfitter is in charge of safety” and step away. The designer of the new layout must eliminate foreseeable risks where possible. The principal contractor then writes the construction phase plan before work starts, provides welfare from the start and makes sure everyone gets a site-specific induction.
Now the plan meets reality. The electrician is pulling cable through the ceiling space on Tuesday morning, and the shopfitter has a tower scaffold in the same aisle (falls and edge protection in general are in machinery, height and handling). Each contractor’s own plan is sensible. Together they put someone on a tower under a cable run. A weekly coordination meeting where each contractor says where it will work, zone by zone, catches the clash before Tuesday. The plan is a living document; update it after the meeting. High-risk tasks fall under permits and isolation.
Of the 18 job postings we sampled (UK, Ireland, EU, US, India, Middle East and Asia; how we research roadmaps), 7 asked for contractor management, which is what the weekly coordination meeting in this example practises.
Other regions, same questions
If your target region is not Great Britain, the structure changes but the questions do not. Who coordinates when several employers share one site? Who checks that contractors are competent? In Ireland the Project Supervisor Construction Stage appears in the HSA’s RAMS guidance. In the US, OSHA’s multi-employer policy sorts employers into creating, exposing, correcting and controlling roles. In India, the OSH Code sets duties for designers and, on larger sites, safety officers. For which duties apply in your country, see workplace safety law of your region. These details were read on 20 November 2026, so check the current text for your state.
What you will learn
- Who the CDM duty holders are and what each must do in Great Britain.
- What a construction phase plan contains and who writes it.
- What OSHA 10 and 30 hour construction classes are, and what they are not.
- The main controls for scaffolds and excavations.
- How to coordinate many contractors on one site.
- How Ireland and India set out construction duties, and what to check for your region.
The parts of this topic
CDM 2015 duty holdersabout 1 hour
In Great Britain the CDM Regulations give duties to clients, designers, principal designers, principal contractors and contractors, to manage risk from start to finish.
HSE says CDM 2015 came into force on 6 April 2015 and aims to help you plan work sensibly, have the right information and consult workers. Commercial clients appoint the others and make sure they carry out their duties; domestic client duties normally pass to other dutyholders. Designers must eliminate foreseeable risks where possible. A principal designer, appointed on projects with more than one contractor, plans, manages and coordinates health and safety in the pre-construction phase. The principal contractor does not own every duty.
- CDM 2015: principal designers HSE (UK) · Guide
Construction phase plansabout 1 hour
The principal contractor writes a plan before work starts, reviews it as work changes and makes sure welfare and site-specific inductions are in place.
A principal contractor is appointed by the client, HSE says, to control the construction phase of any project with more than one contractor. They must prepare a written construction phase plan before that phase begins, then implement and review it. They must also provide suitable welfare facilities from the start, check that appointees have the skills, knowledge, experience and capability, and ensure all workers have site-specific inductions. A plan might list, for example, site rules, traffic routes, emergency arrangements and how contractors will be coordinated. A generic plan copied between projects defeats the purpose.
- CDM 2015: principal contractors HSE (UK) · Guide
OSHA 10 and 30 hour construction classesabout 1 hour
OSHA's outreach classes give awareness of construction hazards. OSHA says none of them is a certification and they do not replace training required by specific standards.
OSHA says its outreach training is delivered by OSHA-authorised trainers, with a 10-hour class giving workers awareness of common hazards and a 30-hour class more suited to supervisors or workers with some safety responsibility, in construction and general industry versions. Students receive a course completion card. OSHA states that the card is not a certification or license, that the program is voluntary and that it does not meet an employer's duty to provide training under specific standards, although some states and employers may require it. The card should not be called a certification on a CV.
- Outreach training program OSHA (US) · Guide Training itself is delivered by authorised trainers and may be paid; check providers.
- Outreach Training Program FAQs OSHA (US) · Guide Says a card is not considered a certification or license.
Scaffoldsabout 1 hour
Scaffolds must be erected by trained, competent people using a safe method, inspected, and used within their limits.
A tower scaffold must be suitable for the work and erected and dismantled by trained, competent people, HSE says; users should know the dangers, and provision and use need rigorous inspection arrangements. HSE lists unsafe erection methods, defects such as missing guardrails and misuse such as using a ladder on a tower as common causes of falls and overturning, and describes safe methods such as advance guardrail and through-the-trap. OSHA's scaffolding page points to standards and fact sheets. A handover certificate needs re-checking after weather or alterations.
- Tower scaffolds HSE (UK) · Guide
- Scaffolding OSHA (US) · Guide
Excavationsabout 1 hour
No ground can be relied on to stand unsupported. Plan supports, have a competent person inspect them and keep materials and plant away from edges.
The law requires preventing danger to people in or near excavations, HSE says, with a competent person to inspect supports at the start of every shift and at other specified times, and no work until the excavation is safe. HSE notes a cubic metre of soil can weigh over 1.5 tonnes and that trenchless methods should be considered at design stage. OSHA says trench collapses pose the greatest risk and recommends sloping, shoring or shielding, a safe way in and out and never entering a trench that has not been inspected.
- Excavations HSE (UK) · Guide
- Trenching and excavation OSHA (US) · Guide
Contractor coordinationabout 1 hour
Construction sites have many employers working in the same space, so coordination, communication and clear responsibilities decide whether work is safe.
CDM aims to help every role plan work so risks are managed from start to finish, share the right information and consult workers, HSE says. Contractors must plan, manage and monitor their own work, check their workers' competence and make sure workers have a site-specific induction. OSHA's multi-employer policy shows how responsibility spreads on shared sites, with creating, exposing, correcting and controlling employers. Example: a weekly coordination meeting where each contractor states the work planned in each zone. Plans that are fine alone can still clash in one area.
- CDM 2015: overview HSE (UK) · Guide
- CDM 2015: contractors HSE (UK) · Guide
- Multi-employer citation policy (CPL 02-00-124) OSHA (US) · Guide
Ireland and Indiaabout 1 hour
Other regions organise the same ideas differently. Ireland uses project supervisors, and India's OSH Code sets duties for designers and safety officers on larger construction sites.
The Irish HSA's RAMS and Safe Plan of Action guidance names the Project Supervisor Construction Stage among the stakeholders consulted when a RAMS is reviewed. India's OSH Code section 9 requires architects, project engineers and designers to consider building workers' safety at the planning stage, and section 22(2) requires safety officers on construction work with 250 or more workers, with qualifications set by rules. Some law-firm sources describe a scale in the Central Rules, but it is not verified in the gazette here: check the current Rules and your state, not an explainer.
- Safe Plan of Action and Risk Assessment Method Statement Health and Safety Authority (Ireland) · Guide
- Occupational Safety, Health and Working Conditions Code, 2020 (gazette text) Gazette of India via DGFASLI · Law or regulation See sections 9 and 22(2).
Practice task
Choose a small imaginary project, such as building a warehouse extension. Draw a duty-holder diagram (client, designer, principal designer, principal contractor, contractors), then write a two-page construction phase plan outline covering site rules, welfare, inductions, scaffold and excavation controls and a weekly coordination meeting.
Skills you build
CDM duty holdersConstruction phase plansScaffold and excavation awarenessContractor coordination
Resources for this topic
Every source here is free. Each link opens the provider's own site in a new tab.
- Construction (Design and Management) Regulations 2015 HSE (UK) · Law or regulation Hub page; the detail sits on the role pages.
- CDM 2015: summary of duties for dutyholders HSE (UK) · Guide
- CDM 2015: legal requirements, a summary HSE (UK) · Guide
- Construction: overview OSHA (US) · Guide Falls, struck-by, electrocution, silica and asbestos are named hazards.
Live Environmental, health and safety (EHS) officer jobs
Roles whose title matches this career path.
Spot a problem with this topic?
Tell us what is wrong, missing or unclear here. Your note is attached to this topic.
Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.