Electrical safety, lifting, pressure and site vehicles
The plant hazards behind many serious injuries: electricity, lifting equipment, work equipment, pressure systems and lift trucks. You will be able to sort equipment by the checks it needs and keep the records.
- Core
- Intermediate
- about 10 hours
Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps
Most regions regulate plant the same way. The equipment must be suitable and safe to begin with, the people using it trained, and it must be maintained. Some equipment must also be examined by a competent person at set intervals, with a written record. In Great Britain these ideas sit in PUWER, LOLER and the Pressure Systems Safety Regulations, and in the US in OSHA standards on electrical work, lockout and powered industrial trucks. So the practical task is a register: what is on site, what check it needs and who holds the record.
Which check does each item need?
Does a bench grinder need the same check as a hoist? Here is how five items in a small workshop sort; the list is an illustrative exercise, not advice for a real site.
- Bench grinder: work equipment under PUWER. The user checks the guard before use. A formal inspection frequency comes from risk assessment, and the record is kept until the next inspection.
- Overhead hoist: lifting equipment. Pre-use check, plus thorough examination by a competent person, with a written report showing the next due date.
- Air compressor with a receiver: a pressure system, even though it is small. If PSSR applies to it, a written scheme of examination must be in place before use, and the scheme sets the frequency.
- Lift truck: operator training for that truck and site, plus an examination before use, at least daily (OSHA 1910.178).
- Extension leads: an electrical risk. HSE says frequency depends on the type of equipment and where it is used, and that yearly testing is not a legal requirement. A lead dragged across a yard needs more attention than one on a desk.
Add a column for who holds the record and one for the next due date, and let the register feed your legal register. If the hoist certificate arrives without a next-due date, send it back and ask for one. An inspector asks for evidence, and an inspection that was not recorded cannot be shown to have happened.
Questions for a competent person, not a do-it-yourself guide
A competent person does the electrical or lifting work, and your job is to ask that person the right questions. For electrical isolation: who is competent, how was it proved dead, who holds the key? For a lift: who planned it, was the ground under the crane checked, and are there overhead lines or buried services nearby? Keep to the questions and leave the work to people trained for it.
The same equipment also needs a permit and a safe system of work, and guards, ladders and site traffic are covered in machinery, height and handling.
What you will learn
- The main electrical hazards and the simple precautions that control them.
- What safe isolation and verification of isolation mean.
- How lifting operations are planned and who must be competent.
- What PUWER asks of work equipment, training and maintenance.
- What makes a system a pressure system and what a written scheme of examination is.
- How lift-truck training and daily checks work, and which inspections and examinations need records.
The parts of this topic
Basic electrical safetyabout 1 hour
Electricity can shock, burn, start fires and ignite explosive atmospheres. Assess it, use suitable equipment and keep it in a safe condition.
HSE lists the main hazards as shock and burns from live parts, arcing, fire from faulty equipment, explosion from unsuitable apparatus and static igniting flammable vapours. Employers must assess electrical hazards, who could be harmed and the precautions. HSE's PAT guidance says the Electricity at Work Regulations require equipment that could cause injury to be kept in a safe condition but do not say what to do, who does it or how often, and that there is no legal requirement for yearly portable appliance testing. Testing everything yearly can leave overhead lines and extension leads unchecked.
- Electrical safety: simple precautions HSE (UK) · Guide
- Portable appliance testing: myths and facts HSE (UK) · Guide
Electrical isolation and safe workingabout 1 hour
Work on electrical equipment starts with isolating it, securing the isolation and verifying that it is dead before anyone touches it.
HSE's HSG85 covers safe working practices for work on or near electrical equipment and advises managers and supervisors who control design, selection, installation, maintenance and operation. OSHA's lockout standard requires verification that isolation and de-energisation have been accomplished before servicing, and a controlled release afterwards. In practice an electrician locks off the circuit, proves it dead with a tested instrument and keeps the key; a switch label, or a lock nobody competent has checked, proves nothing. Only competent people carry out and verify electrical isolation.
- Control of hazardous energy (lockout/tagout) OSHA (US) · Guide
Lifting operationsabout 1 hour
Lifts must be planned, resourced and supervised by competent people, with the equipment, position and surroundings considered.
Lifting operations can put people at great risk, HSE says, and must be properly resourced, planned and organised by competent people. Simple routine lifts may need only a generic plan. Complex ones, such as a tandem lift with several cranes, need a written plan by someone with significant, specific competence. The plan must cover equipment strength, positioning to avoid lifting over people, and hazards such as overhead power lines, trenches and buried services. OSHA's crane page notes crane operator certification rules in construction. Plan the ground under the crane as carefully as the crane.
- Planning and organising lifting operations HSE (UK) · Guide
- Crane, derrick and hoist safety OSHA (US) · Guide
Work equipment (PUWER)about 1 hour
Equipment must be suitable, safe and maintained, used only by people with adequate information and training and fitted with the right safety measures.
PUWER, HSE says, requires that work equipment is suitable for use, safe, maintained and inspected, used only by people who have had adequate information, instruction and training, and accompanied by protective measures such as guarding, emergency stops, isolation from energy and clear markings. Work equipment covers any machinery, appliance, apparatus, tool or installation for use at work, including equipment staff bring themselves. Use covers starting, stopping, repairing, cleaning and maintaining. A ladder or a hand tool counts, not only machines.
- PUWER overview HSE (UK) · Guide
- PUWER: training and competence HSE (UK) · Guide
Pressure systemsabout 1 hour
Stored energy in compressed gas, steam and hot water can cause violent failure. Users need safe equipment, protective devices and a written scheme of examination.
A pressure system, HSE says, contains or is likely to contain a relevant fluid over 0.5 bar (as read on 20 November 2026), and examples include boilers, compressed air systems, pressure cookers, heat exchangers and refrigeration plant. Under the Pressure Systems Safety Regulations a written scheme of examination must be in place, and an examination done, before using qualifying equipment. Users should know the operating limits, fit working protective devices and maintain the equipment. Hydraulic oils are not relevant fluids under PSSR. A small compressor in the corner can still be covered.
- Pressure Systems Safety Regulations 2000 (PSSR) HSE (UK) · Law or regulation
- Using pressure systems HSE (UK) · Guide
Lift trucks and site vehiclesabout 1 hour
Operators need basic, job-specific and familiarisation training, and trucks need regular checks. US rules require operator evaluation at least every three years.
A licence from a previous employer does not prove competence on your truck. HSE says employers must ensure lift-truck operators are trained to the standard in the L117 approved code of practice: basic training, specific job training on the truck and site, and familiarisation under normal working conditions. OSHA's 29 CFR 1910.178 requires operators to complete training and an evaluation, trucks to be examined at least daily before service, and performance evaluations at least every three years, with refresher training after unsafe driving, accidents or near misses (as read on 20 November 2026).
- Lift-truck training HSE (UK) · Guide
- 29 CFR 1910.178: powered industrial trucks OSHA (US) · Law or regulation
Inspection and examination recordsabout 1 hour
Different equipment needs different checks: user checks, inspections and thorough examinations by a competent person, each with its own record.
HSE says lifting equipment may need pre-use checks, regular inspections and thorough examination, normally once or twice a year, by a competent person who completes a written report including the date of the next examination and any defects that could become a danger. Serious defects must be reported verbally at once and to the enforcing authority. For work equipment, PUWER inspection frequencies come from risk assessment, and the record is kept at least until the next inspection. A supplier's certificate with no next-due date does not keep you in step.
- Thorough examinations and inspections of lifting equipment HSE (UK) · Guide
- Inspection of work equipment (PUWER) HSE (UK) · Guide
Practice task
Build an equipment inspection register for a small workshop or warehouse. List at least twelve items across electrical equipment, lifting equipment, a pressure vessel or compressor, a lift truck and general work equipment. Record the type of check, who does it, how often, the rule it comes from and where the record is kept.
Skills you build
Electrical safety basicsLifting operationsWork equipment dutiesPressure system awarenessInspection records
Resources for this topic
Every source here is free. Each link opens the provider's own site in a new tab.
- Introduction to electrical safety HSE (UK) · Guide
- Electrical OSHA (US) · Guide
- Lifting Operations and Lifting Equipment Regulations (LOLER) HSE (UK) · Guide Hub page with planning, safe lifting and thorough examination.
- Introduction to pressure equipment HSE (UK) · Guide
- Powered industrial trucks (forklifts) OSHA (US) · Guide
Latest Environmental Health & Safety jobs
No title matches the role right now, so these are the latest jobs in the same category.
No live jobs to show right now. Check back soon, or browse every green job.
Spot a problem with this topic?
Tell us what is wrong, missing or unclear here. Your note is attached to this topic.
Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.