Decarbonisation planning and target setting

Turn a greenhouse gas inventory into a costed reduction plan: rank options by cost per tonne, check targets against SBTi criteria and note which rules bind your sites.

  • Core
  • Advanced
  • about 30 hours

Part of the ESG analyst roadmap: from the basics to mid level

Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps

Rank the largest sources in the inventory, list the options for each, put a cost per tonne on every option, and only then propose a target. A target chosen first makes the plan fit a number. A plan built first shows which targets are credible.

Ranking a factory’s options by cost per tonne

A factory has three options. All figures are made up for this example, and the sums ignore discounting, which a real appraisal would include.

  • LED lighting costs 20,000 up front, saves 8,000 a year and cuts 20 tonnes a year for 10 years. Net cost is 20,000 - (8,000 x 10) = -60,000 over 20 x 10 = 200 tonnes, so -300 per tonne.
  • A heat pump costs 150,000 up front, saves 5,000 a year and cuts 100 tonnes a year for 15 years. Net cost is 150,000 - (5,000 x 15) = 75,000 over 1,500 tonnes, so 50 per tonne.
  • A renewable electricity contract costs 12,000 a year extra and cuts 300 tonnes a year for 5 years. Net cost is 12,000 x 5 = 60,000 over 1,500 tonnes, so 40 per tonne.

The curve puts LED first, because it pays for itself. But LED removes only 200 tonnes over its life, against 1,500 for each of the others. A cost curve ranks the options and a target needs tonnes, so keep both columns. Check that the renewable contract meets the Scope 2 quality criteria before you count it, and read the Scope 3 value chain topic when the biggest options sit with suppliers.

Testing the target against the near-term criteria

The same factory has an invented inventory: Scope 1 and 2 are 10,000 tonnes and Scope 3 is 30,000, so the total is 40,000. Scope 3 is 30,000 / 40,000 = 75% of the total, above the 40% threshold, so it needs a target (criterion C4 in V5.3.1). Targets must cover at least 67% of it: 0.67 x 30,000 = 20,100 tonnes (C6). The inventory may exclude at most 5% of Scope 3: 0.05 x 30,000 = 1,500 tonnes (C5, which sets the same 5% limit for Scope 1 and 2).

The three options cut 20 + 100 + 300 = 420 tonnes a year, all from Scope 1 and 2. That is 4.2% of 10,000, and nothing yet reaches Scope 3. The plan needs a supplier programme before the target can be submitted, and the climate risk and targets topic shows how to defend the ambition level.

Ask whether the law or a contract already decided

For each site, ask whether any part of the plan is required, not chosen. A site in a sector notified under India’s carbon market works to an intensity target. A supplier to UK central government may need a Carbon Reduction Plan.

What you will learn

  • How to list abatement options, estimate their cost and rank them.
  • How renewable electricity procurement is accounted for under the GHG Protocol and how RE100 sets its criteria.
  • What the SBTi near-term criteria require on boundary, ambition, timeframe and Scope 3 coverage.
  • What an internal carbon price is and how it can sit alongside external prices.
  • How compliance schemes and procurement rules (India's CCTS, UK carbon reduction plans) shape the plan.

The parts of this topic

Abatement options and cost curvesabout 4 hours

List the ways to cut emissions, estimate each one's size and cost per tonne, and rank them into a cost curve.

A cost curve ranks options by cost per tonne avoided, with negative-cost options (those that save money) at the left. A global average cost is not your cost, so use Project Drawdown's Explorer for ideas and replace its numbers with your own site costs. For each solution it gives an emissions potential range in Gt CO2-eq per year, a cost in US dollars per tonne (negative values appear) and a classification such as Highly Recommended; its page says it was last updated on 22 September 2025.

Renewable electricity procurementabout 3 hours

Understand how contracts are counted under the market-based method and what RE100 members commit to.

The GHG Protocol's Scope 2 Guidance says companies with operations in markets that offer supplier-specific contractual instruments report both a location-based and a market-based result and label each, and the market-based method relies on instruments meeting its Scope 2 Quality Criteria, so certificates that do not meet the criteria should not be counted. The 2015 guidance is being revised: GHG Protocol ran a public consultation on it from 20 October 2025 to 31 January 2026, so check its page for the current text. RE100, led by Climate Group, asks members to use 100% renewable electricity by 2050 at the latest and points to technical guidance.

Efficiency, buildings and fleetabout 3 hours

Measure building and freight energy use against peers and pick the cheapest early reductions.

ENERGY STAR Portfolio Manager is an online tool for benchmarking building energy use from utility bills, and a baseline taken before any retrofit is what lets you show the saving afterwards. Many (not all) building types can get a 1-100 score, where 50 is median performance, and it can also track water, waste and GHG emissions. The page does not state a price, so check. For freight, the US EPA's SmartWay programme has separate paths for shippers, carriers and logistics companies.

Supplier programmesabout 3 hours

Cut Scope 3 by setting expectations for the suppliers that matter, with support, tracking and a timeline.

CDP's supply chain programme lets buyers request standard environmental disclosures from chosen suppliers. CDP says supplier engagement through its programme has driven 43 million tonnes of emissions reductions, which is the provider's own claim. The SBTi near-term criteria allow supplier or customer engagement targets to count towards Scope 3 coverage, with such targets to be fulfilled within a maximum of 5 years. Ask the few suppliers that drive your emissions for what you need, instead of asking all suppliers for the same thing.

SBTi targets and validationabout 4 hours

Check a proposed target against the SBTi near-term criteria before you commit to it publicly.

Quote the version in force, not one from memory. The SBTi Corporate Near-Term Criteria (V5.3.1, April 2026) require targets covering Scope 1 and 2, Scope 3 where it is 40% or more of total emissions, coverage of at least 67% of Scope 3, exclusions of no more than 5%, a timeframe of 5 to 10 years from submission, and Scope 1 and 2 ambition consistent with 1.5 degrees. The net-zero page says V1.3.1 is the applicable version through 2026, companies may submit under V1.3.1 or V2.0 from Q1 2027, and all new submissions must align with V2.0 from 1 February 2028.

Internal carbon priceabout 3 hours

Use a stated internal price per tonne in investment decisions, and know the external prices it is compared with.

An internal carbon price is a per-tonne figure that a company chooses and applies in planning, either as a shadow price in investment appraisal or as a fee charged to business units. External reference points include the EU Emissions Trading System, which the Commission's page describes as the world's first international emissions trading system, in its fourth phase for 2021-2030. This page does not cover internal pricing methods, so check practice guidance before you set one, and record why you chose the price.

Capex link and business casesabout 3 hours

Put each option into a business case that finance can compare with other investments.

A business case for a reduction project sets out options, costs, benefits, payback, risks and who pays. Tonnes saved with no cost attached cannot be compared with other investments, so show finance the cost per tonne alongside payback and the effect on emissions. HM Treasury's Green Book is the UK government's guidance on appraisal; its page shows a 2026 edition with the latest update on 28 October 2026 on discounting. Companies do not have to follow it, but it is a free model of how to present options.

Scenario modellingabout 3 hours

Test the plan against different policy and temperature paths so that it holds up if carbon prices or technology move.

The NGFS scenarios portal describes scenario families: orderly, disorderly, hot house world and too little, too late, and the long-term scenarios published in November 2024 as version 5.0, plus short-term scenarios from May 2025. Users can explore data through the IIASA Scenario Explorer. For a company plan, take two or three variables (carbon price, electricity price, technology cost), vary them and see which options stay worthwhile. One central case presented as a forecast hides how much the plan depends on those variables.

  • NGFS Scenarios Portal Network for Greening the Financial System · Dataset The page does not say whether data downloads are free; check the explorers

Compliance schemes and procurement rulesabout 4 hours

Know when a plan is driven by law or a customer contract, such as India's carbon market or UK government supplier rules.

India's Carbon Credit Trading Scheme sets intensity targets (tonnes of CO2e per unit of output) by sector, from a FY 2023-24 baseline; entities that beat targets can receive tradable credit certificates and those that miss must buy and surrender them. ICAP reports sectors notified in October 2025 and January 2026. In the UK, PPN 006 (published 17 February 2025, replacing PPN 06/21 for procurements under the Procurement Act 2023) asks central government buyers to require a Carbon Reduction Plan and a UK net zero by 2050 commitment from bidders for contracts above 5 million pounds a year including VAT. Check which rules apply to your sites before you plan.

Practice task

Take a company inventory (your inventory project is fine) and build a decarbonisation plan: a table of at least eight abatement options with estimated reduction, cost and payback, a ranked shortlist, a target proposal checked against the SBTi near-term criteria, a one-page business case for the top option, and a risk list.

Skills you build

Abatement optionsRenewable procurementSBTi target settingInternal carbon pricingScenario modellingBusiness cases

Resources for this topic

Every source here is free. Each link opens the provider's own site in a new tab.

Back to the whole roadmap

Live jobs

Jobs related to ESG analyst

No title matches the role itself right now, so these are live jobs in the same field.

All ESG & Sustainability Reporting jobs

Spot a problem with this topic?

Tell us what is wrong, missing or unclear here. Your note is attached to this topic.

Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.