Stage 12: Mid level · topic 44 of 47

Mapping ESRS, ISSB, GRI and BRSR

Map ESRS, ISSB, GRI and BRSR requirements onto one master list, score each gap on evidence and turn rule changes into a dated roadmap. One data model then feeds several reports.

  • Core
  • Advanced
  • about 25 hours

Part of the ESG analyst roadmap: from the basics to mid level

Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps

Choose one master list and filter it to what the company must report before you map anything. Then map the other frameworks onto it row by row, score each row on evidence, and keep a change log, because the rules under the rows keep moving. Mapping everything first and filtering later buries the rows that matter.

Mapping a single row: Scope 1 and 2 emissions

An invented company has one row to map, and everything below is made up to show the method. The master list is the matching ESRS datapoints in EFRAG’s IG 3 workbook, with their IDs copied from it; the CSRD and ESRS topic gives the background. Beside them go the IFRS S2 requirement, the GRI disclosure and, if the company is in India, the BRSR Core attribute.

The internal metric is Scope 1 tonnes from fuel records and Scope 2 location-based from electricity invoices, owned by the facilities lead. The status is partial: the company has only the location-based figure. If a datapoint also asks for the market-based one (read its wording), the missing half is a gap, and the effort to close it is an estimated 3 days.

BRSR Core adds a twist. SEBI’s circular says it includes intensity ratios based on revenue adjusted for purchasing power parity. The same tonnes therefore feed a different number: an intensity ratio whose denominator comes from finance, not from the facilities lead. A map by topic name would mark the row covered. A map by unit shows a new calculation and a second owner. See India’s BRSR and carbon market rules for the attributes.

The “mapped against” column and a second scorer

Record the standard, version and date each row was mapped against: the 2023 ESRS, a simplified draft, the interoperability index or an amendment. When a rule changes, filter on that column and revisit only the rows it touches. Have a second person score five rows without seeing your scores. Where you disagree, the scale or the evidence is too vague, and that is worth fixing before you score 40 rows. The finished workbook then feeds the annual process in owning a reporting cycle.

What you will learn

  • How to use EFRAG's ESRS datapoint list as the backbone of a crosswalk.
  • What the published interoperability work between ESRS, ISSB and GRI covers, and where you still need judgement.
  • How BRSR Core in India differs in structure from ESRS and GRI.
  • How to run a gap assessment with a clear scale, evidence and an effort estimate.
  • How to turn rule changes into a dated roadmap.

The parts of this topic

The ESRS datapoint list as the backboneabout 5 hours

Use EFRAG's Excel list of ESRS datapoints as the master list that every other framework is mapped against.

EFRAG's implementation guidance includes IG 3, an Excel workbook of ESRS datapoints, with an explanatory note and a technical-adjustments addendum dated December 2024. EFRAG calls these documents non-authoritative, and they relate to the ESRS adopted in 2023. The Commission lists delegated acts of 3 July 2026 that simplify those standards, and EFRAG's page says it will issue no new guidance for the draft simplified ESRS before adoption, so check whether the list still matches. Filter to the topics the company must report first, then add columns for other frameworks.

ESRS and ISSB crosswalkabout 5 hours

Use the joint EFRAG and IFRS Foundation guidance to see where one report can satisfy both sets of standards.

On 2 May 2024 the IFRS Foundation and EFRAG published ESRS-ISSB Standards interoperability guidance, describing how companies can apply both sets and covering general requirements, climate disclosures and other topics. EFRAG's interoperability page also lists an earlier mapping table of ESRS 2 and ESRS E1 against IFRS S1 and S2. A crosswalk row does not mean the same words satisfy both standards: the guidance helps with structure, but you still decide how to treat differences in materiality and presentation.

ESRS and GRI crosswalkabout 4 hours

Understand the published statement of interoperability on impact reporting and where the two diverge.

GRI and EFRAG issued a joint statement of interoperability on 5 September 2023, saying their standards reach a high level of interoperability on impact reporting, and that ESRS reporters are considered to be reporting with reference to the GRI Standards. That is not the same as 'in accordance with'. The two bodies later published a GRI-ESRS Interoperability Index that maps GRI disclosures to ESRS requirements and notes where they differ. EFRAG's page dates its announcement of an index to 30 November 2023, while GRI's PDF says version 1 was published on 22 November 2024, so check which version you hold.

Mapping BRSR Coreabout 4 hours

See how India's BRSR Core is built from nine attributes, with its own intensity ratios, and where it overlaps with ESRS and GRI.

SEBI's circular of 28 March 2025 defines BRSR Core as a subset of BRSR: key performance indicators under nine ESG attributes, meant for third-party assessment or assurance. It adds a few indicators suited to India and other emerging markets, and includes intensity ratios based on revenue adjusted for purchasing power parity (PPP) for global comparability. Map each attribute to the nearest ESRS datapoint and GRI disclosure, and mark where the definition differs; compare units as well as names, because a matching topic can hide a different unit.

Gap assessment methodabout 3 hours

Score each datapoint on a simple scale, record the evidence and the owner, and estimate the effort to close each gap.

A usable scale has four levels: fully covered with evidence, covered with a weakness, partly covered, not covered. For each row record the internal source, the owner, the last audit finding and the effort in days. Keep a separate list of datapoints that are not material, with the reason. Score on evidence you can open, not on how confident the owner sounds. The IFRS Knowledge Hub lists a jurisdictional guide, which can help you check whether a standard has been adopted where you operate.

Change impact and rule roadmapabout 4 hours

Turn each rule change into a dated action: who is affected, what changes in the data model and by when.

As read on 20 November 2026: the Commission lists delegated acts of 3 July 2026 that simplify the ESRS, a recommendation on a voluntary SME standard (30 July 2025) and a consultation on a limited assurance standard from 12 November 2026 to 18 January 2027. The UK published UK SRS S1 and S2 on 25 February 2026 for voluntary use, and gov.uk says the FCA's final policy statement of 30 September 2026 asks listed companies to use UK SRS on a comply-or-explain basis. The ISSB issued amendments to greenhouse gas disclosures in December 2025. Put each into a dated roadmap, and map to the version in force, not to a draft.

Practice task

Build a crosswalk workbook with at least 40 rows covering climate and workforce topics. Columns: topic, ESRS datapoint, IFRS S2 or S1 reference, GRI disclosure, BRSR Core attribute (if relevant), the internal metric and owner, coverage status (full, partial, none), and effort. Finish with a one-page summary of the five largest gaps and a 12-month roadmap.

Skills you build

Datapoint crosswalksGap assessmentInteroperability analysisChange-impact analysisRoadmapping

Resources for this topic

Every source here is free. Each link opens the provider's own site in a new tab.

Back to the whole roadmap

Live jobs

Jobs related to ESG analyst

No title matches the role itself right now, so these are live jobs in the same field.

All ESG & Sustainability Reporting jobs

Spot a problem with this topic?

Tell us what is wrong, missing or unclear here. Your note is attached to this topic.

Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.