Stage 12: Mid level: from officer to manager · topic 48 of 50

Process safety and major-hazard regimes

Process safety is about rare releases that can hurt many people. You will see how it differs from personal safety, what OSHA PSM, COMAH and Seveso III require, and what to read first.

  • Optional
  • Advanced
  • about 30 hours

Part of the EHS officer roadmap: how to become one and what to learn

Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps

Injury rates cannot answer the question that sets this field apart from everyday safety: what is the worst release this site could have, and which barriers stand between that release and people? Use the rule that applies (OSHA PSM in the US, COMAH in Great Britain, Seveso III in the EU) as the checklist for how those barriers are managed.

When injuries are zero and barriers are slipping

Which should worry a storage site’s manager more: three years with no injuries, or what the quarterly pack shows? The site and the numbers are invented, and this is not advice for a real site.

The pack shows 40 critical inspections due and 31 completed, so 40 - 31 = 9 are overdue, and 9 / 40 = 22.5 percent. Two high-level alarms have been in bypass for more than a month, with no change record. The injury rate says “excellent”. The process safety indicators say the barriers are wearing away.

Send the site manager the 9 overdue items ranked by what failure would cause, not by age. Ask whether the two bypasses went through management of change, and what the release would look like if one of those alarms failed when it was needed. Then put both measures on the monthly pack so the next quarter shows a trend.

Scope, method and review cycles

Which regime applies depends on the substances and quantities on site measured against each regime’s own thresholds and exemptions, not on the industry label. Ask the site’s compliance lead which ones apply and to show you the scoping decision in writing.

A hazard study team needs at least one person who knows the method: HAZID, HAZOP, FMEA and bow-tie basics explains what the methods ask of a team. Learning from major accidents shows how failures like the one above look in a real investigation, and permits, isolation and safe systems of work covers the day-to-day controls around the plant.

The PSM text in 29 CFR 1910.119 sets the review cycles: hazard analyses at least every five years (paragraph (e)(6)) and compliance audits certified at least every three years (paragraph (o)(1)). Check the current text before relying on a number.

What you will learn

  • Why a low injury rate does not show that major hazards are under control, and what process safety indicators add.
  • The elements of OSHA's PSM standard, its scope test and the review cycles for hazard analyses and audits.
  • The hazard analysis methods the PSM standard names, and why the team matters as much as the method.
  • How mechanical integrity and management of change keep a plant in its designed state.
  • How COMAH in Great Britain and the Seveso III Directive in the EU frame major accident prevention.

The parts of this topic

OSHA PSM: scope and the 14 elementsabout 5 hours

PSM is a management programme for processes using highly hazardous chemicals; its elements run from employee participation to compliance audits.

OSHA's page describes PSM as a comprehensive management programme that integrates technologies, procedures and management practices for unexpected releases of toxic, reactive or flammable liquids and gases. The standard, 29 CFR 1910.119, has elements from employee participation and process safety information to hazard analysis, operating procedures, training, contractors, pre-startup review, mechanical integrity, hot work, change, investigation, emergency planning, audits and trade secrets. Before you decide that a flammable-liquid store is, or is not, covered, read the scope paragraph and the exemptions.

  • Process Safety Management OSHA (United States) · Law or regulation Overview, publications and enforcement directives; check current ones

Hazard analysis: HAZOP, what-if and LOPAabout 6 hours

A process hazard analysis uses structured methods and a competent team; the PSM standard names several and requires revalidation at least every five years.

OSHA's PSM booklet lists what-if, checklist, what-if/checklist, HAZOP, FMEA and fault tree analysis, or an appropriate equivalent, and says the team should have process and engineering expertise, at least one person who knows the process and one who knows the method. A team with no operator on it can follow every guide word and still miss how the plant is really run. Findings must be addressed promptly, with documented actions and a schedule. The free sources listed here do not teach HAZOP or LOPA, so plan a recognised course for them.

Mechanical integrity and management of changeabout 6 hours

Keep critical equipment inspected and fit for service, and review every change before it goes live.

OSHA's booklet says mechanical integrity covers pressure vessels and storage tanks, piping and valves, relief and vent systems, emergency shutdown systems, sensors, alarms and interlocks, and pumps, with inspection records showing date, person, equipment identifier, description and results. A change needs a written procedure covering technical basis, impact on safety and health, operating procedure changes, time period and authorisation; staff are trained before startup, and replacements in kind are excluded. A temporary alarm bypass, for instance, gets an end date and a named approver, or it quietly becomes permanent.

Safety-critical elements and process safety indicatorsabout 4 hours

Identify the barriers that prevent or limit a major accident and measure whether they are working, using indicators beyond injury rates.

HSE's HSG254 is aimed at senior managers and safety professionals and offers a six-stage process to set up performance monitoring that gives assurance of control over major hazard risks; it is aimed mainly at major hazard operators. Use it to choose indicators such as overdue critical inspections, safety-critical alarms in bypass and loss-of-containment events, because lagging indicators alone are late and few, and a quiet year does not prove control. Example: a monthly count of alarms in bypass, with the longest bypass shown.

Major-hazard regimes: COMAH, Seveso and RMPabout 5 hours

Sites holding large quantities of dangerous substances sit under a stricter regime in Great Britain, the EU and the US.

One regime's thresholds do not carry over to another. Look up the regime in the country where the site stands. HSE says COMAH 2015, in force since 1 June 2015, implements most of the Seveso III Directive, requires operators to take all necessary measures to prevent major accidents and limit harm, and is enforced by HSE jointly with the Environment Agency, Natural Resources Wales or SEPA. The European Commission says Seveso III entered into force on 13 August 2012 and covers over 11,000 installations. EPA's Risk Management Program under the Clean Air Act requires a risk management plan, resubmitted every five years.

Learning from major accidentsabout 4 hours

Real investigations show how normal people and ordinary decisions line up to cause a catastrophe.

HSE's Buncefield page says explosions occurred on 11 December 2005 at the Hemel Hempstead oil storage depot, with a large fire and over 40 people injured but no fatalities, and that convictions were secured against five companies, with almost £10m in combined fines and costs. The page links to the investigation board's reports and to the Process Safety Leadership Group's principles of process safety leadership. Concluding that it could not happen at your site is the wrong lesson. Example: read one report in full and write a one-page lessons brief.

  • Buncefield HSE (UK) · Guide Reports, leadership principles and research

Practice task

For a fictional storage site holding 20 tonnes of a flammable liquid, write a one-page process safety summary: whether the PSM flammable-liquid threshold in the standard might apply (read the text for exemptions), an owner for each PSM element, a list of critical equipment for mechanical integrity, a management-of-change form and four process safety indicators with definitions.

Skills you build

Process safety managementProcess hazard analysisMechanical integrityManagement of changeMajor-hazard regimes

Resources for this topic

Every source here is free. Each link opens the provider's own site in a new tab.

Back to the whole roadmap

Live jobs

Live Environmental, health and safety (EHS) officer jobs

Roles whose title matches this career path.

All Environmental Health & Safety jobs

Spot a problem with this topic?

Tell us what is wrong, missing or unclear here. Your note is attached to this topic.

Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.