Policy, procedure and work instruction have three different readers, so write each at its own level: direction for the policy, roles for the procedure, the steps of the task for the work instruction. Test every draft on the people who must follow it before you publish, then control the versions and the records so you can show an inspector what applied on a given day.
Rewriting a line nobody can act on
A five-page near-miss procedure lands on your desk with this line:
Near-miss events should be reported by relevant personnel to the appropriate supervisory function within a reasonable timeframe.
Nobody can act on that. Give it an actor, an action and a deadline:
Any worker who sees a near miss tells their supervisor before the end of the shift. The supervisor logs it on the near-miss form the same day.
Both versions are invented for the example.
Testing the rewrite on the floor
Give the page to two operators and ask each to tell you what they would do next. If either hesitates at “logs it”, you have found the missing detail: where the form is, and what a near miss looks like on this site. Add it, retest, and put the owner, version number, approval date and review date at the top. Keep version 1 where you can still find it.
Fix the highest-risk documents first
An inherited pile of procedures cannot all be fixed at once. List them against the tasks that can hurt someone most, and begin with the three that carry the highest risk, such as the permit system and isolation: see safe systems of work and permits and risk assessment step by step. Rewrite, test and put those three under version control before you touch the rest. Keep the rewritten procedure and a short summary report for your evidence portfolio: they show an employer how you write.
Thresholds and retention periods differ by country
The written-policy threshold and the retention periods differ by country, and the law for your site is the one that applies. Read your regulator’s current text before you set a rule for the whole site.
What you will learn
- The difference between a policy (what and why), a procedure (who does what, when) and a work instruction (the steps at the machine).
- Plain-language rules: short sentences, active voice, headings, and testing a draft on the people who must follow it.
- How a risk assessment and method statement fit together, and how a job hazard analysis differs.
- How to write a one-page report for a manager that ends in a decision.
- How to keep versions and records so that you can show which document applied on which date.
The parts of this topic
Policy, procedure and work instructionabout 2 hours
Three layers of document with different readers: a policy sets direction, a procedure assigns roles, a work instruction shows the steps.
HSE says a health and safety policy sets out your general approach and should say who does what, when and how. In Great Britain every business must have one, and with five or more employees you must write it down and share changes with employees. A procedure covers a process such as permit control; a work instruction covers one task at the machine. A policy so long that it doubles as a procedure goes unread and cannot be audited, so keep it to direction. For hot work, the policy says it is controlled, the procedure says who issues the permit, and the work instruction shows the checks at the welding bay.
- Prepare a health and safety policy HSE (UK) · Guide What a policy is and when it must be written down
Plain language that people followabout 2 hours
Short sentences, active voice, headings and tested drafts make a procedure usable on the shop floor.
The US federal plain language guides cover principles, writing for understanding, design and testing for understanding. GOV.UK's guidelines group their rules under clear language, structure, tone, links and titles. Apply them: one instruction per sentence, the actor first ('the operator checks the guard'), numbered steps, and a picture where words fail. Example: give the draft to someone who does the job and watch where they hesitate. Each hesitation marks a sentence to rewrite.
- Plain language guides Digital.gov (US General Services Administration) · Guide Principles, writing, design and testing; adapted from PlainLanguage.gov
- Writing to GOV.UK standards: writing guidelines GOV.UK · Guide See the clear language section and the A to Z style guide
Risk assessments, method statements and JHAsabout 2 hours
A risk assessment says what could go wrong and how it is controlled; a method statement or job hazard analysis says how the job is done safely step by step.
In UK construction, RAMS means a risk assessment plus a method statement. HSE's template records who might be harmed and how, existing controls, further action, owner and date. OSHA's job hazard analysis booklet breaks a job into steps and finds hazards at each one. A RAMS pack reused unchanged on every job fails, because each one has to name this site, this task and these people. The two formats say the same thing in different shapes.
Reports that managers act onabout 2 hours
A good report leads with the decision needed, then the evidence; leaders read the first lines and skim the rest.
HSE's leaflet for directors and board members sets out leadership actions in a Plan, Do, Check, Act frame. Mirror that: one line on the situation, one on the risk, the data in a small chart, the options and your recommendation. The National Careers Service lists strong written communication among the skills for a health and safety adviser. A report that lists inspections done, with no change and no request, gets filed. An opening that asks for a decision looks like this: 'Guard repairs on line 2 are overdue. Decision needed: stop the line on Friday or approve overtime.'
- INDG417: Leading health and safety at work HSE (UK) · Guide Free leaflet aimed at directors and board members
Version control and approvalsabout 1 hour
Show which version of a procedure applied on which date, who approved it and how old copies are retired.
Microsoft's guidance explains that libraries can track major versions (such as 5.0) for approved milestones and minor versions (5.1) for drafts, with a history of who changed what and when. Give each controlled document an owner, a version number, an approval date and a review date. Keep superseded versions retrievable, because after an incident someone will ask which rule applied that day. Example: give someone the job of removing printed copies when version 3 replaces version 2, because a copy pinned on a wall outlives the controlled document.
- How versioning works in lists and libraries Microsoft Support · Guide Major and minor versions, drafts and history
Records and retentionabout 1 hour
Know which records the law makes you keep and for how long, and keep the same set in one findable place.
HSE's RIDDOR page has a section on what records you need to keep for reportable injuries, over-seven-day injuries, disease and dangerous occurrences. The EU framework directive requires employers to keep a list of occupational accidents that leave a worker unfit for work for more than three working days, and lets Member States set the detail by size of undertaking. File accident lists, training records and permits by year in one place. Other periods apply to exposure, training and audit records and differ by country and substance, so check the current text, and do not copy a retention period from another country's guidance.
- RIDDOR: reporting and record keeping HSE (UK) · Law or regulation Records section; follow links for detail
- Framework Directive 89/391/EEC (Article 9) EUR-Lex (European Union) · Law or regulation Risk assessment, accident lists and reporting duties; check national law
Translation and site languageabout 1 hour
A procedure that workers cannot read does not protect them; provide it in the language they understand.
OSHA's inspections fact sheet lists the worker's right to receive information and training in a language and vocabulary the worker understands. Machine translation with no review is risky, because a wrong safety instruction is worse than none. Translate procedures and warning signs into the main languages on your site, add pictures and symbols, and have a bilingual worker check the result: ask a bilingual operator to read the translated lockout steps aloud and flag any technical term that sounds wrong.
- OSHA Inspections fact sheet OSHA (United States) · Guide Workers' rights, including information in a language they understand
Practice task
Write a one-page plain-language procedure for a task you know (purpose, scope, roles, steps, stop points, records and review date), test it on two colleagues, revise it, and add a half-page monthly safety summary for a fictional site manager that ends in one decision.
Skills you build
Procedure writingPlain languageReport writingDocument controlRecord keeping
Resources for this topic
Every source here is free. Each link opens the provider's own site in a new tab.
- HSG65: Managing for health and safety HSE (UK) · Guide Free PDF; Plan, Do, Check, Act and how documents support the system
- Safety and health management systems OSHA (United States) · Guide Seven core elements and Recommended Practices; start with a basic program
- Health and Safety Authority: topics HSA (Ireland) · Guide Includes safety statement and risk assessment guidance
- Occupational Health and Safety Specialists (19-5011.00) O*NET OnLine (US Department of Labor) · Dataset Tasks include writing reports and operational reports
Live Environmental, health and safety (EHS) officer jobs
Roles whose title matches this career path.
Spot a problem with this topic?
Tell us what is wrong, missing or unclear here. Your note is attached to this topic.
Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.