Stage 2: Law and enforcement · topic 7 of 50

Environmental law of your region

Environmental law controls waste, permits and discharges, and it differs by region. The parts are alternatives: pick one and write a duties sheet for a site, with its waste steps, permits, regulator and records.

  • Core
  • Beginner
  • about 12 hours
  • Pick one

Part of the EHS officer roadmap: how to become one and what to learn

Written by the GreenHired editorial teamSources last checked 20 November 2026How we research roadmaps

Five questions about one site produce an environmental duties sheet. What waste does it produce? How must each stream be stored and tracked? Who may carry or treat it? Which activity needs a permit or consent? Who inspects? Choose the region you expect to work in, answer each from a primary page, and mark anything you could not confirm, because that gap list is part of the work.

A 20-person metal workshop in England

The workshop produces cardboard packaging, scrap metal and used solvent. It is invented and the steps follow GOV.UK’s description for England, so this is not advice for a real site. Each waste stream goes through the same five checks: can it be prevented, reused, recycled or recovered, in that order; how is it stored so it cannot escape or get mixed up; is a waste transfer note completed for every load; is the carrier registered (check before the first collection); and is it hazardous (GOV.UK sets extra duties for hazardous waste, so confirm this for the solvent first).

Cardboard and scrap metal clear the first four checks quickly and become two rows on the duties sheet. The solvent takes the longest, because the fifth check may add duties. Last, ask whether any activity needs a permit using GOV.UK’s “check if you need an environmental permit” page, and whether the Environment Agency or the council would grant it. Write the answer down even when it is “no permit needed, checked on this date”.

Employers in our sample of 18 postings (UK, Ireland, EU, US, India, Middle East and Asia; how we research roadmaps) were split on environmental duties: 9 listed duties such as waste, permits, monitoring or spills. Read an advert’s duties before you decide how much of this topic to learn first. Stage 7 goes deeper: waste classification, storage and records and permits, air, water discharge and stormwater.

A permit’s status is a fact you check on the day

A permit can be past its stated end date and still in force for those already covered. The US stormwater permit in the United States part is the example: EPA says the 2021 permit expired but remains in force for operators it already covered. Record each permit’s status and the date you checked it, and turn its conditions into tracked actions in a legal register. Why permits and consents exist at all is explained in how safety and environmental law is built and enforced.

What you will learn

  • The main waste and pollution rules for your region and the body that enforces each.
  • The waste hierarchy and the steps a business must take with its waste.
  • Which activities need a permit or consent and who grants it.
  • How hazardous chemical and spill reporting duties work where you are.
  • How to find the current text and confirm what you read is up to date.

Pick one of these

These are alternatives. Learn the one your employer or course uses; one is enough to complete the topic.

Englandabout 3 hours

Businesses must follow a waste duty of care, and some activities need an environmental permit from the Environment Agency or the local council.

GOV.UK says businesses must keep waste to a minimum by preventing, reusing, recycling or recovering it in that order, store it safely, complete a waste transfer note for each load, check the carrier is registered and not allow illegal disposal. Check the carrier's registration yourself rather than assuming it. GOV.UK also sets extra duties for hazardous waste. Permits: depending on the activity and pollution risk, you apply to the Environment Agency or your local council, and activities are classed as Part A1, A2 or Part B. Scotland, Wales and Northern Ireland have separate guidance.

European Unionabout 3 hours

The Waste Framework Directive sets the waste hierarchy and polluter-pays principle, and the Industrial Emissions Directive 2.0 sets permits and best available techniques.

The Commission says the Waste Framework Directive entered into force on 12 December 2008, sets a five-step waste hierarchy, confirms that the original waste producer pays for waste management, and was revised in 2025 (in force 16 October 2025) mainly for food and textile waste. The revised Industrial Emissions Directive, Directive 2010/75/EU as amended by Directive 2024/1785, entered into force on 4 August 2024; national authorities grant permits, and best available techniques conclusions are the basis for permit conditions. Do not stop at the directive: your duties are in the national law and in your permit.

United Statesabout 3 hours

EPA regulates hazardous waste by monthly quantity, community right-to-know rules require chemical reporting, and industrial stormwater needs permit coverage.

EPA says hazardous waste generators are regulated under RCRA according to the amount they generate in a calendar month, not the size of the business. EPCRA, from 1986, requires industry to report on storage, use and releases of certain chemicals, including hazardous chemical inventories. For industrial stormwater, EPA says federal regulations require coverage under NPDES permits for listed industrial categories; as read on 20 November 2026, EPA said the 2021 Multi-Sector General Permit expired on 28 February 2026 and was administratively continued. States can add to federal rules, so check yours.

Indiaabout 3 hours

Central and state pollution control boards, hazardous waste rules and consents to establish and operate matter in practice. The primary texts could not be verified for this page, so check them.

One posting in our sample, for an EHS associate manager in Pune, named the Central Pollution Control Board, state pollution control boards, the Central Ground Water Authority, hazardous waste rules and consents to establish and operate (CTE and CTO). The CPCB site and the primary rules could not be opened for this page, and the Ministry of Environment pages loaded in Hindi (as read on 20 November 2026), so check the rules on CPCB, your State Pollution Control Board and India Code rather than relying on summaries. The OSH Code itself touches waste: section 6(1)(e) makes employers ensure disposal of hazardous and toxic waste, including e-waste.

Practice task

Write a two-page 'environmental duties' sheet for one site type, such as a small factory or a warehouse, in your chosen region. List its waste streams, the steps required for each, any permit it would need, the regulator, and the records you would keep. Mark every point you could not confirm from a primary source.

Skills you build

Waste duty of careEnvironmental permitsRegional environmental lawRegulator mapping

Resources for this topic

Every source here is free. Each link opens the provider's own site in a new tab.

Back to the whole roadmap

Live jobs

Live Environmental, health and safety (EHS) officer jobs

Roles whose title matches this career path.

All Environmental Health & Safety jobs

Spot a problem with this topic?

Tell us what is wrong, missing or unclear here. Your note is attached to this topic.

Notes are sent from this page with JavaScript on. Without it, write to us on the contact page.